(9-1-2. Board Setti nqs]
2. VV-Ol
Board
Setting
Install the switching regulator adjustment
fixture.
See section 9-1-1.
Step 2.
Remove the two screws securing the VV-01 hoard as follows.
Remove.
D
CN
0
~
927
@
DCN924
@OCN922
@
CN923D
=
0
CN926
CN925
D
CN9290
Step 3.
Connect the connectors CN921. 922. 923.926.927.928
and 929 of
the extension
cahle assy to the connector
panel of the power
unit.
I-
Z
w
~
Z
19
-l
«
>-
-l
0-
0-
:::J
C/)
a:
w
~
o
0-
0)
Disconnect
the connectors CN20L 202 and 203 connecting
the
VV-Ol hoard
and the other
hoards
and
also remove
the
connectors CN 102. 104 and 106 connecting the FY-01 hoard and
the other hoards
hecause the leads of CN 102. 104 and 106
ohstruct the
vv-o
1 hoard removal.
After pulling the VV-Ol hoard from the power unit turn the VV-
01 hoard 180
0
and insert it into the guide rail of the hoard fixture
and fix it with the hoard holder.
5.
Connect
the connectors
CN102. 104. 106. 201. 202 and 203
removed at step 4 to the proper positions on the FY-Ol and VV-
01 hoards.
6.
Connect the connectors
CN924 and 925 of the extension cable
assy to the corresponding
connectors
on the VV-O1 hoard.
VV-01,CN201
_AC-39,CN307
VV-Ol
,CN202-FV-Ol,CN1
07
VV-Ol,CN203-FV-0I,CN107
F V-O 1.CN 102 -AC-39.CN305
FV-Ol,CN1
04 -AC
-39.CN 311
F V -01 ,CN1 06 --FV
-o2f:,N602
7.
Turn on the power and perform the VY-Ol hoard operation
check and adjustment.
The work must he performed in a short
time.
Step 8.
After performing
the operation check and adjustment
turn the
power off and disconnect
the power cord.
After passing five minutes or more. reinstall the Y-Y-Olboard to
the power unit in reverse order of the ahove steps.
9-6
BVH-2000(U/C)/PS/PM,
BVH-2180(U/C)/PS/PM
BVH-2500(U/C)/P
Содержание BVH-2000
Страница 1: ...he handles available panels are optional Iy ...
Страница 4: ......
Страница 11: ......
Страница 43: ......
Страница 45: ......
Страница 46: ......
Страница 73: ......
Страница 87: ......
Страница 91: ......
Страница 92: ......
Страница 103: ...2 ASSEMBLE or INSERT 1 AUTO MODE 6 ENTRY OUT 4 PLAY or SHUTTLE Editing point search 11 REVIEW 1 95 ...
Страница 105: ......
Страница 106: ......
Страница 114: ......
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 139: ......
Страница 141: ......
Страница 149: ......
Страница 150: ......
Страница 155: ......
Страница 161: ......
Страница 163: ......
Страница 179: ......
Страница 181: ...ARM 1 C C C ilr l I ...
Страница 185: ......
Страница 191: ......
Страница 195: ......
Страница 201: ......
Страница 203: ......
Страница 219: ......
Страница 221: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 227: ......
Страница 228: ......
Страница 229: ......
Страница 239: ......
Страница 245: ......
Страница 250: ...z o i a o LL Z BVH 2000 U C PS PM BVH 2180 U C PS PM ...
Страница 257: ......
Страница 259: ......
Страница 265: ......
Страница 269: ......
Страница 305: ......
Страница 323: ......
Страница 344: ......
Страница 370: ...15 ...
Страница 371: ......
Страница 375: ......
Страница 388: ...of Standard Load for Output Check POWER UNIT 1 Standard for Variable a w o a 0 ...
Страница 396: ...CN921 8 1 Spec CN921 8 5 Spec hoard BVH 2000 U C PS PM BVH 2500 U C P on ON 100 OFF 5 ...
Страница 401: ......
Страница 435: ......
Страница 449: ......
Страница 452: ......
Страница 462: ......
Страница 471: ......
Страница 476: ......
Страница 480: ......
Страница 482: ... o w o ...
Страница 484: ......
Страница 492: ......
Страница 494: ...80 U C ...
Страница 496: ......
Страница 497: ......
Страница 498: ...14 2 BVH 2000 U C PS PM BVH 2500 U C P 80 U C PS PM w l j j Capstan Ree Servo Check ...
Страница 500: ...lel pin 3 12 0 01 Vdc RVl TP5 EQ 02 NG Edge Can nectar Pin 21 B A B R138 w I U U ...
Страница 504: ......
Страница 505: ...BVH 2000 U C 3 673 996 22 Volume 1 1985 Printed in Japan 1985 4 09 ...