D R
Preliminary
Information
A
The mechanical
brake works when the power is off or the
tape is not threaded.
When the brake torque
is adjusted
tape even if the power is turned
off during
tape running.
When
with any application
position of the adjustment
spring, the
brake band
must be replaced.
after the replacement
are carried
out according
to the
Mechanical
brake
torque
adjustment
-- --Adjust by performing
in
3-9-1
C"S"
side) or
1.
Loosen
the
two set screws
shown
in Fig. 3-35.
While
Clean the cylindrical
part at the lower part of the reel table,
which
has been in contact
with the brake band.
the
E
band.
3.
Install the new brake band in the position
shown in Fig. 3-
35
and
4.
While
pressing
the plunger,
place the brake
adjustment
fixture C"B" mark faces the front) onto the reel motor shaft
as
5.
While
not pressing
the plunger,
check that the clearance
between the link stopper and the brake link
1.0
±
0.2
mm. If
is not within
of
the link stopper.
fixture
and place the reel table. While
pushing
the reel
table to the reel motor, tighten
the two set screws.
Mechanical
Brake Torque
Adjustment
instructions
of "Preliminary
Information".
BVH-2000( U
IC)
IPS/PM
80(U/C)/PS/PM
BVH-2500(U/C)/P
Fig. 3-35.
Brake
Band
Replacement
Reel Table Height
Confirmation
a
Confirm
that the tape has no strong contact with the reel
flange in F.FWD
mode. Confirm
the same thing also in
according
to section
3-24-2.
w
u
z
«
z
ui
f-
Z
<t
2
o(j
~
u
w
I
U
U
(3
o
a:
ur
0..
Содержание BVH-2000
Страница 1: ...he handles available panels are optional Iy ...
Страница 4: ......
Страница 11: ......
Страница 43: ......
Страница 45: ......
Страница 46: ......
Страница 73: ......
Страница 87: ......
Страница 91: ......
Страница 92: ......
Страница 103: ...2 ASSEMBLE or INSERT 1 AUTO MODE 6 ENTRY OUT 4 PLAY or SHUTTLE Editing point search 11 REVIEW 1 95 ...
Страница 105: ......
Страница 106: ......
Страница 114: ......
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 139: ......
Страница 141: ......
Страница 149: ......
Страница 150: ......
Страница 155: ......
Страница 161: ......
Страница 163: ......
Страница 179: ......
Страница 181: ...ARM 1 C C C ilr l I ...
Страница 185: ......
Страница 191: ......
Страница 195: ......
Страница 201: ......
Страница 203: ......
Страница 219: ......
Страница 221: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 227: ......
Страница 228: ......
Страница 229: ......
Страница 239: ......
Страница 245: ......
Страница 250: ...z o i a o LL Z BVH 2000 U C PS PM BVH 2180 U C PS PM ...
Страница 257: ......
Страница 259: ......
Страница 265: ......
Страница 269: ......
Страница 305: ......
Страница 323: ......
Страница 344: ......
Страница 370: ...15 ...
Страница 371: ......
Страница 375: ......
Страница 388: ...of Standard Load for Output Check POWER UNIT 1 Standard for Variable a w o a 0 ...
Страница 396: ...CN921 8 1 Spec CN921 8 5 Spec hoard BVH 2000 U C PS PM BVH 2500 U C P on ON 100 OFF 5 ...
Страница 401: ......
Страница 435: ......
Страница 449: ......
Страница 452: ......
Страница 462: ......
Страница 471: ......
Страница 476: ......
Страница 480: ......
Страница 482: ... o w o ...
Страница 484: ......
Страница 492: ......
Страница 494: ...80 U C ...
Страница 496: ......
Страница 497: ......
Страница 498: ...14 2 BVH 2000 U C PS PM BVH 2500 U C P 80 U C PS PM w l j j Capstan Ree Servo Check ...
Страница 500: ...lel pin 3 12 0 01 Vdc RVl TP5 EQ 02 NG Edge Can nectar Pin 21 B A B R138 w I U U ...
Страница 504: ......
Страница 505: ...BVH 2000 U C 3 673 996 22 Volume 1 1985 Printed in Japan 1985 4 09 ...