Page 8
12’ Garden Master (3.5mm)
5. END WALL FRAMES
5A. Front End wall Frame
Pieces Required:
2
90” Composite Tubing - YELLOW
2 Metal Corner Posts
1
35 ¾” PVC Pipes. - WHITE
1
35 ¾” Composite Tubing - WHITE
6
Snap-T’s
2 12 ½ ” PVC pipes -WHITE
4 4-Way Metal-T’s
5B. Middle End wall Frame
Pieces Required:
2
90” Composite Tubes - YELLOW
6 4-Way Metal-T’s
1
35 ¾” Composite Tube - WHITE
1. Slide a
90” Composite Tube - yellow
snugly into a 4-way Metal-T (As pictured above) and tighten the eyebolt. Do this
twice. Attach a
35 ¾” Composite Tube - White
between the 4-way Metal-T’s on the 90” Composite Tubes - yellow.
Measure the distance between the two 4-way Metal-T’s and adjust them so they are 36 1/2” from “in” side to center.
Tighten the eyebolts.
2. Slide two
4-way Metal-T’s
on to each 90” Composite Tube - yellow (Note the direction of the posts pictured above).
Tighten the eyebolts of the the top 4-way metal-T so the distance from the center of the middle arm to the bottom of the
90” composite tube - yellow is 48 ¼” and the distance from the center of the middle arm of the bottom 4-way metal-T to the
bottom of the 90” composite tube - yellow is 22 ¾”.
35 ¾” Composite Tubing -White
4-way Metal-T
uu
Be sure to get the composite tubing and the
PVC pipe in the right spot. Composite tubing
has a gray fiber throughout and does not flex.
While the PVC is white and flexable
Note: On Metal Corner Posts, the
Arm with red mark attaches
to 90” Composite Tube.
35 3/4” PVC
pipe - White
90” Composite Tubing - Yellow
35 ¾” Composite Tubing - White
Snap-T
4-way Metal-T
Metal Corner Post
(
arm with red mark
)
12 ½” PVC - White
22 ¾”
48 ¼”
36 1/2”
Snap-T
4-way Metal-T
1. Slide each
90” Composite Tube - Yellow
snugly into a
Metal Corner Post
(insert tube into the arm with the red mark)
and tighten the eyebolt. Attach a
35 ¾” Composite Tube
between the Metal Corner Posts on the 90” Composite Tubes.
Adjust 90” Composite Tubes (With metal coner posts on them) so the distance between the Metal Corner Posts is 36 ½”
from “in” side to center - tighten the eyebolts.
2. Attach a
Snap-T
on to both 90” Composite Tubes about 13” below the Metal Corner Posts. Insert and glue a
35 ¾” PVC
pipe
between these Snap-T’s.
3. Attach two
Snap-T’s
to both 35 ¾” pipes. Attach and glue
12 ½” PVC pipes
between the Snap-T’s. Slide over each 12½”
PVC pipe - white (With snap-Ts attached) to the edge of the Metal Corner Posts.
4. Slide two
4-way metal-T’s
on both 90” Composite Tubes - yellow (Note direction of the posts). Tighten both bottom 4-way
metal-T’s so they are 22 ¾” from the bottom of the 90” Composite Tube - yellow to the center of the fitting. Tighten both
top 4-way metal-T’s so they are 48 ¼” from the bottom of the 90” Composite Tube - yellow to the center of the fitting.
90” Composite
Tubing -Y
ellow
4-way Metal-T
22 ¾”
48 ¼”