![solexx Garden Master G-512 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/solexx/garden-master-g-512/garden-master-g-512_assembly-instructions-manual_1315236011.webp)
12’ Garden Master (3.5mm) Page 11
1. Locate the 6
Side Wall tubes
(
without slots
- From step 1). Slip an 18” PVC pipe -
½” diameter
into the center (bottom) of
the Side Wall Tube (It sits loose inside of the tube) and then insert the side wall tube into the
Metal Fitting
on the base
frame (Do this for all six side wall tubes - with out slots. Insert the two Side Wall tubes with the extra Snap-T on it, into the
Corner Posts on the Back Base Frame. Tighten the eyebolts. Draw a line 2 ¾” down from the top of the corner side wall
tubes. Do this on all four corner side wall tubes.
2. Use a 1” Screw to attach the 8 remaining Side Wall tubes (
Single-Slotted
) into the Snap-T’s on the BASE FRAME.
Make
sure the Side Wall tubes are seated all the way into the Snap-T’s.
Adjust the Snap-T’s on the side wall tubes so they
face towards the inside of the greenhouse.
3. Line up an
8’ Ridge Frame
with the 8’ base frame of the greenhouse. Make sure the Snap-T’s and Metal fittings on the
base frame are lined up with the Metal Fittings of the 8’ Ridge Frame. Add a
4-way 120° metal-T
to the end of the 8’
Ridge Frame and tighten the eyebolt. Insert the
4’ Ridge Frame
into the opposite end of the 4-way 120° metal-T making
sure that the metal fittings on the 4’ ridge frame line up with fittings on the base frame that the side wall tubes go into.
tighten the eyebolts. Repeat this step to make two 12’ Side Ridge Frames.
4. Place the Metal fittings of a Ridge Frame onto the top of the Side Wall tubes. Tighten the eyebolts. Note: On the corner
Side Wall tubes, move the ridge frame up or down so the arm of the 3-way 120° Metal Corner Post lines up with the line
drawn on the Side Wall tubes in step 7-1 above. Repeat this step for the other side wall.
5. Attach a
28” PVC pipe - Green
between the Snap-T’s (B) on the Back End wall and Back Side Wall tubes. See diagram
below.
Adjust all the Snap-T’s on the side
wall tubes to face towards the
inside of the greenhouse.
Snap-T (B)
7. SIDE WALL ASSEMBLY
Pieces required:
14 Side Walls (
Made in step 1
)
2 28” PVC pipes - Green
2 8’ Side Ridge Frames (
from Step 3A
)
2 4’ Side Ridge Frames (
from Step 3B
)
2 4-Way 120° Metal-T
6
18” PVC pipe -
½” diameter
8 1” Screws
28” PVC pipe
Green
Side Wall
tube with
extra Snap-T
8’ Side Ridge Frame
4-Way 120° Metal-T
4’ Side Ridge Frame
Composite drawing for Steps 7 & 8A
Slotted end goes into the Snap-T.
Secure 74” tube with 1” Screw
Insert an 18” PVC pipe -
1/2” diameter
into the
Side Wall Tubes that go into metal fittings.
This pipe provides support when
attaching the anchor kit (If purchased) to the
greenhouse.
1.
2.