Page 6
12’ Garden Master (3.5mm)
1. Slide two
4-way Metal-T’s
onto a
94 ½” Composite Tube - Green
.
Attach a
Metal Corner Post
(arm with the Red Mark is vertical)
to one end of the 94 ½” Composite Tube - GREEN and tighten the
eyebolt. Attach a 2nd Metal Corner Post to the opposite end and
adjust the Metal Corner Post so that the measurement from the “in”
side of one Corner Post to the center of the opposite Corner Post is
95 ¼”. Secure each 4-way Metal-T at 28 ¾” (“in” side to center) from
each Metal corner Post with eyebolts on the outside arms and 1”
Screws on the inside arms (see diagram 1 to the right). This is the
Front Base Frame Assembly.
2. Use the
Front Base Frame
assembly as a measuring device to line
up the fittings on the Middle and Back Base Frame Assemblies. On
the Middle Base Frame, attach four
4-way Metal-T’s
onto the 2nd
94 ½” Composite Tube - Green
. For the Back Base Frame, attach
two
Metal Corner Posts
and two
Snap-T’s
to the 3rd 94 ½”
Composite Tube - Green (see diagram 2 to the right).
3. Attach both
BF- 92” Composite Tubes - Red
to the Metal Corner
Posts of the Front Base Frame assembly. Attach both
BS - 92”
Composite Tubes
to the 4-way Metal-T’s of the Front Base Frame
assembly. (See diagram 3 to the right)
4. BASE FRAME
Make sure working surface is clean and level!
Pieces required:
4
Metal Corner Posts
6
4-way Metal-T’s
3
94 ½ ” Composite Tubing - GREEN
1
94 ½ ” Composite Tubing - GREEN (
Double-Slotted
)
2
BF - 92” Composite Tubing - RED (
from Step 3A
)
2
BS - 92” Composite Tubing - RED (
from Step 3A
)
4 Snap-T’s
2 44” Composite Tubing - RED (
from Step 3B
)
2 1” Screws
Middle Base Frame
4-way Met
al-T
4-way Metal-T
Metal Corner Post - Arm with red mark is facing up
Snap-T
Back Base Frame
3B. 4’ RIDGE FRAMES & BASE RODS
Pieces Required:
3
4-Way 120° Metal-T’s
3
3-Way 120° Metal Corner Posts
4
Snap-T’s
5 44” Composite Tubing - RED
1. Insert a
3-Way 120° Metal Corner Post
snugly on one end of a
44” Composite Tube
-
Red
and twist eyebolt until tight.
Insert a screwdriver or long bolt through the eyebolt and twist the eyebolt clockwise another ½ to full turn.
2. Slide a
4-Way 120° Metal-T
over the 44” composite tube - Red so that the distance from the “in” side of the 3-Way 120°
Metal Corner Post to the center of the 4-Way 120° Metal-T is 22 5/8”. Twist the eyebolt tight. Repeat for a total of three
4’ Ridge Frames.
3. Use a 4’ Ridge Frame to line up the
Snap-T’s
on the remaining
44” Composite Tubes - Red
. Follow the pattern above.
3-Way
120°
Metal Corner
Post
4-Way 120° Metal-T
Snap-T
(Make 3)
4’ Ridge Frames
44” Composite Tubing - Red
22 5/8”
NOTE: It is important that the
corner post is put on the right way.
(Red Mark is on the vertical arm)
28 ¾”
36 ½”
28 ¾”
95 ¼”
Metal Corner Post
(red mark on the
vertical arm)
4-way Metal-T
Remove eyebolt
Install 1” Screw
Front Base Assembly
94 ½” Composite Tubing - Green
94 ½” Composite Tubing - Green
Front Base Frame
Front Base Assembly
BS
- 92” Composite
Tubing - Red
BF - 92” Composite Tubing - Red
1.
2.
3.