
38
Sur
ve
yi
n
g
• Point number input
Step 3:
Press
to ready the instrument for point
number input.
Step 5:
Press
twice to ready the instrument for
point number input.
(See "8.4 Flow of Recording Data".)
• Attribute setting
Step 5:
Press
to ready the instrument for attribute
setting. (See "8.4 Flow of Recording Data".)
• Go and Return setting
Step 3:
Press
to display the Go and Return Setting
Screen. (See "8.3 Double-run Measurement".)
• Reviewing stored data
Steps 3 and 5: Press
to display the contents of the
selected JOB. (See "13.1 Data Check and Edit".)
• Manually inputting measurement data
Steps 3 and 5: Press
. Measurement data can now be input
manually. (See "8.4 Flow of Recording Data".)
Notes:
Содержание SDL30
Страница 76: ...75 Other Procedures RAB code RAndom Bi directional code is a coded staff used with SOKKIA digital levels ...
Страница 82: ...81 Regulations For users in the Republic of Korea ...
Страница 83: ...82 MEMO ...
Страница 84: ...83 MEMO ...
Страница 85: ...84 MEMO ...
Страница 86: ...This is the mark of the Japan Surveying Instruments Manufacturers Association Li ion S Li ion ...
Страница 87: ...SURVEYING INSTRUMENTS OPERATOR S MANUAL SDL30 SDL50 Digital Level 13th ed 16 1003 2000 SOKKIA TOPCON CO LTD ...