Vega 30 Router User Manual
Software Upgrade
Maintenance 12.3
Issue1 Revision 1
Page 231
© 2017 SAM
For the final upgrade step, the Vega 30 unit restarts itself.
The whole upgrade takes about 5 minutes. During this time, the unit will not communicate
with RollCall Control Panel.
15. Wait for the unit to complete its restart.
Wait for the Vega 30 front panel LEDs to indicate ‘System OK’ status - flashing green
‘System’ LED.
(Front panel LED colors are described in Section 4.4 “Front Panel Status Indicators”
on page 33.)
This means the unit has completed its upgrade installation and is ready for use.
See Figure 183.
Figure 182 Unit Upgrade Window - Final Upgrade Log Message before Unit Restart
Important:
Wait for the Vega 30 module unit to finish restarting:
After the upgrade package file is received by the Vega 30 unit, the Vega 30 unit begins to
install the individual upgrade files etc. The unit can take up to 5 minutes to do this.
The final step is a Vega 30 restart.
The Vega 30 unit is only fully ready for use after it has restarted and the front panel status
LEDs indicate ‘system OK’. (See Section 4.4 “Front Panel Status Indicators” on page 33.)