![Siemens MODULARIS Uro Plus Скачать руководство пользователя страница 42](http://html.mh-extra.com/html/siemens/modularis-uro-plus/modularis-uro-plus_service-instructions-manual_1266117042.webp)
MODULARIS Uro Plus
SPL1-130.840.02
Page 2 of 34
Siemens AG
Rev. 03
04.05
CS PS 24
Medical Solutions
4 - 2
LITHOSTAR MODULARIS
Shock wave head
4
Shock wave head covers
4
•
Switch the system off. Remove the covers on the system unit by removing the screws.
•
Remove the water reserve tank and drain the remaining water.
•
Reinstall the water reserve tank.
•
Switch the system on. Position the support arm in the horizontal position.
•
Set service switch S2 on board D3 to position 2 (service on).
•
Select "service" on the control unit and then "coupling circuit".
•
Activate the corresponding key for "empty" (S6) on the control unit until the coupling
bellow is located next to the lens.
•
Switch the system off.
•
Only the equipment with ultrasound localization:
- Unscrew the two placement parts for the ultrasound.
- Ensure that the screw lengths are correct when tightening them.
•
Remove the mounting screws (I/Fig. 2) for the upper cover on both sides of the shock
head.
•
Push the buttons in the direction of the arrow on both sides of the iso-center phantom
(Fig. 2) and at the same time flip the iso-center phantom back (Fig. 1).
•
Detach the upper cover, removing it toward the front.
•
Push the buttons on both sides of the iso-center phantom in the direction of the arrow
(Fig. 1) and at the same time flip the iso-center phantom up (Fig. 2).
•
If required, remove the 3 cover screws from both lower covers and remove the covers.
•
Reattach the covers in the reverse order after completion of all work.
Fig. 1
Fig. 2
I