Function Measured Values
The function measured values for the Synchronization function are displayed in their own primary, secondary
and percentage measured-value windows. Voltage measurements are always displayed as ph-ph voltages,
even if the associated measuring point records phase-to-ground voltages. The function measured values are
determined and displayed as soon as the device is functional. The difference values are calculated as soon as
the stage is activated.
Table 8-24
Protection-Specific Values of the Synchronization
Values
Primary
Secon-
dary
% Referenced to
V
1
Reference voltage V
1
kV
V
Rated operating voltage of the
primary values
V
2
Voltage to be synchronized V
2
kV
V
Rated operating voltage of the
primary values
f
1
Frequency of the voltage V
1
Hz
Hz
Rated frequency
f
2
Frequency of the voltage V
2
Hz
Hz
Rated frequency
dV
Voltage difference V
2
-V
1
kV
V
–
df
Frequency difference f
2
-f
1
Hz
Hz
–
dα
Angle difference α
2
-α
1
o
–
–
Multiple Synchronization Points
The synchronization function can only be used within a Circuit-breaker function group. It always operates on
the circuit breaker that is linked to the Circuit-breaker function group. The reference to the circuit breaker is
therefore unique. If you wish to switch several circuit breakers (synchronization points) with the device, you
must create several Circuit-breaker function groups.
Different Synchronization Conditions per Synchronization Point
Within the synchronization function, you can operate maximum 2 stages of the stage type Synchrocheck and
maximum 6 stages of the type Synchronous/asynchronous in parallel. All setting parameters for a synchroni-
zation point are included in each synchronization stage.
If you have to synchronize with different synchronization conditions (parameter settings), several synchroniza-
tion stages are used for a synchronization point/circuit breaker. In this case, you must define which of the
synchronization stages is currently active via the binary signal
>Selection
(synchronization stage x). The
closing conditions are checked if the respective stage is activated via the
>Selection
binary signal and the
stage is activated.
The fault indication
Multiple selection
is issued upon simultaneous selection of different synchroniza-
tion stages. If several synchronization stages are activated and the input signal
>Selection
(synchronization
stage x) is missing at the starting time, a valid selection is awaited during the supervision time
Max.durat.
sync.process
. If this does not come, the process is terminated.
Different Voltage-Transformer Ratios of Both Parts of the Electrical Power System
The settings of the rated parameters of the transformer for the measuring points automatically takes the
different voltage-transformer transformation ratios of both parts of the electrical power system into account.
The
Voltage adjustment
parameter is not needed for this purpose.
Synchronization via a Transformer
There are systems in which a power transformer is located between the voltage measuring points of the circuit
breaker to be synchronized. The device automatically considers the different voltage stages by setting the
transformer ratios (within the measuring points).
A phase displacement must be taken into account based on the transformer vector group, via the
Angle
adjust. (transform.)
parameter.
Control Functions
8.4 Synchronization Function
1134
SIPROTEC 5, Overcurrent Protection, Manual
C53000-G5040-C017-8, Edition 07.2017
Содержание 7SJ82
Страница 8: ...8 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 38: ...38 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 60: ...60 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 186: ...186 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 194: ...194 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 966: ...966 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 1072: ...1072 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 1236: ...1236 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 1306: ...1306 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 1370: ...1370 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 1404: ...1404 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 1576: ...1576 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 1614: ...1614 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...
Страница 1634: ...1634 SIPROTEC 5 Overcurrent Protection Manual C53000 G5040 C017 8 Edition 07 2017 ...