5.1
40
5.2
Mounting in a cable channel...................................................................
40
5.3
Mounting with cable tie............................................................................
40
5.4
Mounting with C-Fix bracket.....................................................................
40
6
Electrical installation........................................................................ 42
6.1
Safety.........................................................................................................
42
6.2
42
6.2.1
Connection to Flexi Soft..........................................................
42
6.2.2
Connection to Flexi Classic.....................................................
43
6.2.3
Connections of the Flexi Loop nodes.....................................
44
6.2.4
Connection of the Flexi Loop nodes.......................................
45
6.2.5
Connections of the EMSS Flexi Loop node............................
46
6.2.6
Connections of the OSSD Flexi Loop node............................. 47
6.2.7
Connections of the PWRI power supply accessory................
48
6.2.8
Connections of the MSTR1 Flexi Loop accessory..................
48
6.2.9
Connections of the MSTR2 Flexi Loop accessory..................
49
6.2.10
Connections of the DIAG Flexi Loop accessory...................... 50
6.2.11
Connection of Flexi Loop YCON1 and YCON2 adapters........
50
6.2.12
Connections of the Flexi Loop YCON1 adapter......................
51
6.2.13
Connections of the Flexi Loop YCON2 adapter......................
52
7
Configuration..................................................................................... 55
7.1
55
7.2
Safety.........................................................................................................
55
7.3
55
7.4
Configuration with a standard controller................................................
57
7.4.1
Prerequisites............................................................................
57
7.4.2
Configuration of the hardware................................................
57
7.4.3
Options for application design in the PLC..............................
61
8
Commissioning.................................................................................. 67
8.1
Display sequence during switching on....................................................
67
8.2
Commissioning using the DIAG Flexi Loop accessory or the MSTR
Flexi Loop accessory................................................................................. 67
8.3
67
8.3.1
Thorough checks before the initial commissioning...............
68
8.3.2
Regular thorough check of the protective device by quali‐
fied safety personnel...............................................................
68
8.3.3
Daily functional checks of the protective device...................
68
9
Troubleshooting................................................................................. 69
9.1
In the event of faults or errors.................................................................
69
9.2
69
9.3
Indications of the LEDs............................................................................
69
9.3.1
MS LED.....................................................................................
69
CONTENTS
4
O P E R A T I N G I N S T R U C T I O N S | Flexi Loop
8015836/YT10/2016-05-24 | SICK
Subject to change without notice