
5
Electrical installation
Hybrid ABOX MTA...-S533-...-00/L10
Operating Instructions – MOVIFIT
®
FC
85
5.9
Hybrid ABOX MTA...-S533-...-00/L10
INFORMATION
• The hybrid ABOX is based on the standard ABOX MTA...-S02.-...-00. The follow-
ing therefore only describes the additional plug connectors in comparison with the
standard ABOX.
• For a description of the terminals, refer to chapter "Standard ABOX MTA...-
• Customers cannot use terminal strips X25, X30, X31 and terminals X35/4, X35/5
in the ABOX because the described plug connectors are assigned to them.
• All electrical connections of the POF option L10 are installed at the factory.
5.9.1
Description
The following figure shows
• the hybrid ABOX with
– M12 plug connectors for connecting PROFINET IO (plugged at the factory)
– M12 plug connectors for DC 24 V supply of the POF option L10 (plugged at the
factory)
– M12 plug connectors for connecting digital inputs/outputs
• and the POF option L10 with
– push-pull plug connectors for connecting the PROFINET POF:
[2]
[1]
[3]
[4]
[5]
[7]
[6]
X21
X25
X26
X27
X28
X22
X11
X12
X13
X23
X24
X3
1
X3
0
18014403568045579
[1]
Maintenance switch (optional)
[2]
PE connection
[3]
M12 plug connector for digital inputs/outputs
[4]
Diagnostics socket (RJ10) under the screw plug
[5]
M12 plug connectors for the PROFINET IO interface and the DC 24 V supply
(plugged at the factory)
[6]
Push-pull SCRJ plug connector for PROFINET POF interface, port 2
[7]
Push-pull SCRJ plug connector for PROFINET POF interface, port 1
21316996/EN – 12/2014
Содержание MOVIFIT FC
Страница 2: ...SEW EURODRIVE Driving the world ...
Страница 225: ......
Страница 226: ......
Страница 227: ......