the six screws covering the mid mounting holes to the front mounting holes. Remount the rack ears at
the middle of the unit.
Figure 4.5: Rack Ears Mounting – Side View of Enhanced Chassis Showing Screw Holes
4.7
Powering up the Unit
Once the chassis is securely mounted and signal cables are connected, it can be powered up by
connecting the power cable to a mains source. When the power cable is connected the power LEDs of
the individual optional modules should light up and the chassis fans should operate.
Note that it will take some time from power-up until the modules can be accessed via the management
interface – typically the start-up may take up to two minutes.
4.8
Initial Configuration
There are two alternative ways of performing an initial configuration of the probe module:
1. By using the preconfigured IP address of the probe management port
2. Via serial console emulated over USB
For most users the first method will be the easiest.
Note that if there are two 10G Probe modules in the chassis, each module should be configured
individually, one by one.
4.8.1
Initial Configuration Using the Pre-Set IP-Address
The 10G Probe modules are shipped with the following factory settings:
Management (eth1) IP address:
10.0.20.101
Management (eth1) subnet mask:
255.255.0.0
In order to connect to the eth1 management port, the PC used for set-up should have corresponding
20
VB3xx 10G Probe User’s Manual version 5.3
Содержание VB330
Страница 1: ...VB3xx 10G Probes Applies to software release v5 3 Form 8046E February 2017...
Страница 7: ...F Appendix Restoring probe factory defaults 203 VB3xx 10G Probe User s Manual version 5 3 7...
Страница 29: ...VB3xx 10G Probe User s Manual version 5 3 29...
Страница 30: ...6 THE 10G PROBE GRAPHICAL USER INTERFACE 30 VB3xx 10G Probe User s Manual version 5 3...
Страница 101: ...VB3xx 10G Probe User s Manual version 5 3 101...
Страница 149: ...The PID threshold template has the following settings VB3xx 10G Probe User s Manual version 5 3 149...