Manual revision 001
Section 3: Preparing SBE 39
plus
-IM for Deployment
SBE 39
plus
-IM
34
3.
Ensure all data has been uploaded.
4.
In
SBE 39plus IM
Current Configuration Options
, modify the setup if
desired:
A.
If desired, click the
Time Options
button to change the date and time
tracked by the program. Options include UTC time, local time, or
selection of an offset from UTC time. After you click OK, the time
shown in Configuration Options reflects your selection.
B.
Click
Set time to . . .
to reset the real-time clock in the 39
plus
-IM to
match the time shown.
C.
Click
Clear memory
to make the entire memory available for
recording.
D.
Click
Clear events
to clear the event counter.
E.
Select desired behavior for when you disconnect the USB cable:
•
To start autonomous sampling when you remove the cable, select
Start sampling.
•
To set a delayed date and time to start autonomous sampling,
select
Start sampling at . . .
, and click the calendar icon. Select
the desired start date and time in the calendar, and click OK.
•
To do nothing, select
Do not start sampling
.
F.
Modify the sample interval for autonomous sampling.
G.
Click the Update Configuration
button to program the setup into
the 39
plus
-IM.
•
If you selected
Clear memory
and / or
Clear events
, the software
requires confirmation before sending the command to the
39
plus
-IM, to prevent accidental erasing of data.
5.
Unplug the USB cable from the 39
plus
-IM.
6.
Install new desiccant (see
Replacing AA Cells and Desiccant
in
Section 5:
Maintenance and Calibration
).
7.
Reinstall the end cap and close the housing:
A.
Remove any water from the O-rings and mating surfaces in the
housing with a lint-free cloth or tissue. Inspect the O-rings and
mating surfaces for dirt, nicks, and cuts. Clean as necessary.
Apply a light coat of O-ring lubricant (Parker Super O Lube) to
O-ring and mating surfaces.
B.
Carefully fit the end cap into the housing, pushing in until the first
O-ring is seated.
C.
Using a wrench, screw the end cap into the housing.
The SBE 39
plus
-IM is ready for deployment.
Note:
Changes made in SBE 39plus IM
Configuration Options do not take effect
until you click the Update Configuration
button.
CAUTION:
Do not use Parker O-Lube, which
is petroleum based; use only
Super O-Lube.