Construction
E - 2
1. Points regarding refrigerant piping construction
This size to be as long as possible
(This is the length to which the
adjoining pipe will be inserted.)
Internal dowel
Cutting position
This size to be as short as
possible (8mm or less)
This size to be as long as possible
(this is the length to which the adjoining
pipe will be inserted)
●
Component 1
●
Component 3
Internal dowel
Cutting position
Internal dowel
This size to be as short as possible
(2mm or less)
Brazed part
Cutting position
Internal dowel
This size to be as short as possible
(2mm or less)
Brazed part
This size to be as long as possible
Used vertically
(can be used pointing up or down)
Plus angle
(15-30 degrees)
Horizontal line
Outdoor unit side
Indoor unit side
Used horizontally
Horizontal line
Brazed component
Component 1
Component 3
Brazing location
Between B, C
Between D, E
●
After cutting, remove all burrs, and finish the end face correctly.
(If the pipe is badly bent or dented, use a tool to open the opening.)
●
Check that there is no dirt or foreign matter inside the pipe branch.
●
The pipe branch can be used horizontally or vertically (either pointing up or pointing down).
(1) Points regarding branch piping construction
●
Cut the component with a pipe cutter at the size/position corresponding to size of the on site piping, selected
based upon the total capacity of the indoor units. If the end size is the same as the on site pipe size, then it is
not necessary to cut the component.
Note
)
Cut the component so as not to distort the pipe. (The connecting pipe may not be able to be inserted.) Refer
to the installation construction
manual supplied with the outdoor unit for details of selecting the pipe size.
APR-CHXJ140S
APR-CHXJ280S
In this component there are positions where it has been brazed and those where it has been
processed to be continuous. The cutting position varies, so care is needed.
Cutting example :
1)Cutting at a non-brazed position 2)Cutting at a brazed position
●
Branch piping should be insulated with insulating material resistant to temperatures of 120
o
C or higher.
●
For further details, refer to the installation construction manual.
Note) The method of cutting at a location other
than where it has been brazed is the same
as cutting at a non-brazed position.
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...