Design
D - 13
For
expansion
Outdoor unit
: Branch piping (separately sold item)
: Ball valve (BV sold separately)
Within 40cm
(from the
first branch)
Indoor unit for
future expansion
(7) Subsequent System Expansion
1
Conditions for expanding indoor units
1) The maximum number of indoor units that can be connected to an outdoor unit is 24.
2) The range of indoor unit capacity that can be connected is 50-200% of the outdoor unit capacity.
2
If there is a possibility of system expansion after installation, then install a ball valve (sold separately) on the branch piping of
the indoor unit side. (Figure 1)
1) In order to prevent oil from being drawn inside, reverse the slope on the pipe.
2) Place the ball valve as near as possible to the main piping (within 40cm).
3) If the diameter of the ball valve is smaller than the main piping, then reduce the diameter with a reducer. Only install the
reducer at this point.
4) Select a position where operations are easy, and where at a later date it is possible to confirm the installation location.
5) If the ball valve is installed on the indoor side (including the expansion of the indoor units) and in the main piping, then
it should be facing towards the indoor side.
3
Select the piping size for the proposed expansion. [refer to (2) “Selecting branch piping sizes”]
Fig. 1
3. Refrigerant piping design
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...