Construction
E - 8
2. System Configuration
Carefully read the following guidelines to ensure safety before beginning the electrical construction work.
●
The precautions given in this test consist of specific [
Warnings
] and [
Cautions
]. They are all important items
regarding safety, so they must be carried out.
●
Their meanings are as described below.
Warnings
: Indicates situations in which faulty operation could result in the possibility of serious personal injury
or even death.
Cautions
: Indicates situations in which faulty operation could result in the danger of personal injury or physical
damage.
(3) Cautions regarding electrical construction
●
This equipment uses an inverter, so use an earth leakage breaker that is compliant with an inverter.
●
Fix the electrical power cable and the operation cable between the water heat exchanger unit and the outdoor unit to
the fixing clamper in the outdoor unit, and do not touch the following type of objects.
• The moving or high temperature parts of an engine or electrical machine.
• Refrigerant piping, small diameter pressure reading test pipe or any part of the refrigerant circuit.
• Sharp edges of fitting metals or other objects .
●
When laying the electrical power cable and the operation cable between the water heat exchanger unit and the
outdoor unit to the electrical equipment box, leave about 20cm of slack inside the box.
●
The remote control cable has polarity, so be certain to connect to the correct terminal number.
●
Use signal cable for communication cable (remote control, operation cable between water heat exchanger unit and
the outdoor unit) to make it easy to differentiate from power cable (AC 230V).
●
Also, do not run the power cable with the communication cables.
●
Keep the chiller power and communication cables at least 3m from television, radio, stereo, interphone, personal
computer, word processor, and telephone including antenna, operation, and power cables. This can cause noise and
other undesirable effects.
1
cautions regarding safety
●
Electrical installation should be entrusted to the dealer where this product was purchased, or a professional contractor.
Incomplete electrical installations carried out by yourself can result in defects, electric shocks or fire.
●
The electrical installation should be carried out by an properly qualified electrician, in accordance with “Technical
criteria for electrical equipment”, “Electrical wiring regulations”, “ To those undertaking the electrical construction
(chiller)”. If there is a defect in the electrical construction then this can result in an electric shock, or cause fires.
●
Use a dedicated branch circuit for the electrical cabling, and do not share it with other equipment. Secondary
damage can occur as a result of a circuit breaker activating.
●
Use only the specified cable (type, size) and carefully join them. Ensure that external force from the cable does not
transmit to the terminals by securing them properly. If the cable joints are not stable then this can result in heat
generation and cause fires.
●
Fix an overload circuit breaker to each unit with the correct load setting. If the incorrect breaker is installed then
this can result in heating, short circuit, and lead to fires.
●
Fix an earth leakage breaker to each unit with the correct load setting. (earth leakage breaker rating: 30mA, 0.1s)
If an earth leakage breaker is not installed then this can result in electrical shocks and fires.
●
For the grounding connection, install a D type connection in accordance with the Technical Criteria for Electrical
Equipment (used to be type 3 grounding connection).
Do not connect the grounding cable to gas pipes, water pipes, lightning conductors, or telephone grounding cables.
If the grounding is not sound then this can cause electric shocks.
Warning
Warning
Caution
2
Cautions regarding electrical cabling construction
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...