Separately sold parts
F - 2
1. Parts for the outdoor unit
Component A
Component B
Exhaust gas top
warning mark (red line)
Screw
(2 including
the opposite side)
Alignment mark
Component A
Existing exhaust gas pipe
Exhaust gas pipe fixing screws (2)
(1) Exhaust extension kit
1
External dimension diagram
●
Exhaust extension kit (SGP-PEX224F)
2
Limitations when the exhaust pipe is extended
The following limits must be observed when carrying out exhaust pipe extension work.
* For exhaust pipe, use product name ONJ pipe
φ
60 series. This item to be supplied on site,
together with fittings (feet, split-halves) (supplier: Hokuai Corporation).
3
Installing separately sold items
●
Exhaust extension kit (SGP-PEX224F)
1) Remove the polythene bag from the adaptor for the exhaust gas extension, and verify each component.
2) Use a seal material. The seal material is to be supplied on site. Use Shinetsu Chemicals RTV-KE45 or
equivalent.
7) Remove the two screws securing the existing exhaust gas pipe on the top of the outdoor unit.
8) Place component A on the top of the existing exhaust gas pipe. Apply some seal material to the tips of the
two screws removed above, and connect component A together with the existing exhaust gas pipe on the top
of the main body.
3) Check that the alignment marks on component B are aligned. Pull the exhaust top in the direction of the
arrow.
4) Remove the two screws securing components A and B.
5) These screws will be used again for reassembly, so do not lose them.
6) Pull component B away from component A in the direction of the arrow.
Limitations during construction
Limiting value
Outdoor air temperature
-5
o
C or higher
Extension of the exhaust pipe
5m and 4 bends or less
Slope of the exhaust pipe
Greater than 3/100 (upward)
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...