Water heat exchange unit
H - 12
lOper
ate button
lStop button
lCoolin
g/h
eatin
g chan
g
e switch
lOper
ate display LED
lAbn
orm
ality display LED
lOil warnin
g display LED
Con
tact
poin
t
si
gn
al
Separ
ately sold r
em
ote con
tr
ol or
cen
tr
al m
onitorin
g boar
d
W
ater h
eat e
xchan
g
er unit
Hot an
d cold water
in
tak
e temper
atur
e
Hot an
d cold water
outflow temper
atur
e
W
ater h
eat e
xchan
ger b
refri
ge
ra
nt
inlet
temper
atur
e
W
ater h
eat e
xchan
ger b
refri
ge
ra
nt
outlet
temper
atur
e
W
ater h
eat e
xchan
ger b
freeze pr
even
tion
th
erm
ostat
W
ater h
eat e
xchan
ger a
refri
ge
ra
nt
inlet
temper
atur
e
W
ater h
eat e
xchan
ger a
refri
ge
ra
nt
outlet
temper
atur
e
W
ater h
eat e
xchan
ger a
freeze pr
even
tion
th
erm
ostat
K
ey SW 1 N
o
.
Rotary SW 5 N
o
.
4P dip SW 1 N
o
.
5P dip SW 1 N
o
.
8P dip SW 2 N
o.
Sli
d
e SW 4 N
o
.
W
ater h
eat e
xchan
g
er
b-1 electri
c valve
W
ater h
eat e
xchan
g
er
b-1 electri
c valve
W
ater h
eat e
xchan
g
er
a-2 electri
c valve
W
ater h
eat e
xchan
g
er
a-1 electri
c valve
Contr
oller board
Contr
oller board
Seri
al comm
uni
cati
on
20 N
o. LED output
Oil float switch H level
Oil float switch L level
Bypass valve
Expan
si
on valve
Liqui
d valve
Four-way valve
Fuel gas valve 1
Fuel gas valve 2
Cr
ank case h
eater
N
eutr
alizer h
eater
Coolin
g water pump
Inverter
Fan m
otor 1
Fan m
otor 2
En
gin
e oil supply pump
Solen
oi
d valve 1 f
or oil supply
Solen
oi
d valve 2 f
or oil supply
Fuel adjustm
en
t valve
Cr
ank an
gle sen
sor
Cam an
gle sen
sor
En
gin
e oil pr
essur
e SW
Coolin
g water
Starter m
otor
Igniti
on 1
Igniti
on 2
Igniti
on 3
Igniti
on 4
Step m
otor
En
gin
e
PC
LED output 7 N
o
.
7 segm
en
t LED
output 6 N
o
.
K
ey SW 4 N
o
.
Sli
d
e SW 2 N
o
.
<sen
sor input>
Compr
essor inlet temper
atur
e
Compr
essor outlet temper
atur
e
Coil inlet tem
per
atur
e
Coil outlet temper
atur
e
Extern
al air
temper
atur
e
Exhaust gas temper
atur
e
Compr
essor
inlet pr
essur
e
Compr
essor
outlet pr
essur
e
Coolin
g water float SW
Refri
g
er
an
t
pr
essur
e SW
In
terlock
H
ot an
d cold
water pump
oper
ate comm
an
d
An
cillary equipm
en
t con
tr
ol boar
d
●
H
ot an
d cold water pump power cir
cuit
●
Flow switch an
d in
terlock
5. Control
(1) System block diagram
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...