Periodicinspection
G - 2
1. Periodic maintenance contract
In order to use a gas heat pump (GHP) air conditioning system for a long time, periodic inspection by a specialist service
person is necessary. The company operates a yearly periodic inspection contract system, so when the GHP is purchased
customers are encouraged to take out a contract.
After entering into a contract, a specialist service person will visit your installation for periodic inspection, at intervals
depending upon the number of hours of operation.
For further details regarding the inspection contract, please inquire at the dealer where this system was purchased or our
service company.
(1)Test run
A charge is made for periodic inspection.
Note
:
The periodic change period is calculated on the basis of 2,000 operating hours per year, and 13 years usable life. If it
becomes necessary to replace parts other than the above periodic replacement parts, there will be a charge separate from
the periodic inspection contract charge.
Note
:
If dust and dirt get into the fan of the outdoor unit heat exchanger this will result in reduced performance or breakdown.
Therefore, it is recommended that you consult with the dealer where the system was purchased or with a specialist service
company, and have the heat exchangers cleaned. (A charge will be made for this service)
(2)Guarantee period
One year from the day of completion of hand-over of the equipment after making test run.
However, for the engine and parts requiring periodic replacement, the period shall be the shorter of one year from the
date of completion of hand-over of the system after commissioning or 2,000 operating hours.
(3)Periodic inspection items outside the guarantee period.
The number of periodic inspections per year varies depending upon the hours of operating the heating and cooling
system.
The table below shows the case for 2,000 hours of heating/cooling operation in one year. If a periodic inspection
contract is concluded, then a GHP specialist service person will visit, carry out the indicated inspections, replace parts,
and make adjustments.
(
The time on site will be determined by the service person
)
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...