Design
D - 27
Table 1 Sound-proofing calculation sheet (filled in example)
Frequency
Hz 63
125 250 500 1000 2000 4000 8000
From the operating sound characteristics diagram in the outdoor unit manual
1)Operating sound of outdoor unit
dB
69 66 62 59 56 49.5 45 41.5
From distance attenuation
2) Distance attenuation
dB
From Figure 1, attenuation of unit operating sound –22
Figure 2 Refraction attenuation quantity,
sound path difference d=A+B-d
δ
:0.5
3) Refraction attenuation
dB
-3.5 -5 -6.5 -9 -12 -15 -18 -21
Figure 6 additional sound due to reflections (wall)
4) Increase for reflections (wall
surface)
dB
By calculation or the simplified method, the combined two sounds MAX value is +3
Figure 7 additional sound due to reflection (ground surface)
5) Increase for reflections(ground
surface)
dB
By calculation or the simplified method, the combined two sounds MAX value is +3
6) Sub-total
dB
49.5
45 39.5 34 28 18.5 11 4.5
Conversion factors for A characteristic
7) Overall A characteristic correction
factor
dB
-26 -16 -9 -3 0 +1 +1 -1
8)A characteristic
dB(A)
23.5
29
30.5 31 28 19.5 12 3.5
Frequency
Hz 63 125 250 500 1000 2000 4000 8000
From the operating sound characteristics diagram in the outdoor unit manual
1) outdoor unit operation sound
dB
Distance attenuation
2) distance attenuation
dB
Distance attenuation value:
Refraction attenuation sound path difference d=A+B d
δ
:
3) Refraction attenuation
dB
Additional sound due to reflections (wall)
4) Additional sound due to reflection
(wall surface)
dB
By calculation or the simplified method, the combined two sounds MAX value is +3
Figure 7 additional sound due to reflections (ground surface)
5) Additional sound due to reflection
(ground surface)
dB
By calculation or the simplified method, the combined two sounds MAX value is +3
6)
Sub-total
dB
Conversion factors for A characteristic
7) Overall A characteristic conversion
factor
dB
-26 -16 -9 -
-
3 0 +1
+1 -1
8)
A
characteristic
dB(A)
When the calculation in the above table is complete, the overall A characteristic is calculated at the reception point.
(calculate in order of largest sound level). When the overall A characteristic is calculated, combine this with the
background noise level to obtain the total sound level at the reception point.
When the calculation in Table 1 is completed, the overall A characteristic is calculated.
(8)Sound-proofing calculation sheet (example)
6. Sound-proofing measures
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...