Design
D - 40
Example of earthquake resistance calculation sheet
Earthquake resistance calculation sheet
Model name:
1. Foundation bolt data
No. of foundation bolts
: N=
No. of bolts in short direction: n
1
=
Foundation bolt diameter
: D= mm
No. of bolts in long direction : n
2
=
Foundation cross-sectional area : A=
D
2
/4=
mm
2
Installation method
(refer to construction method)
(can also be selected after calculation)
Foundation bolt short term allowable load : Ta= N/bolt
2. Calculation
Design horizontal magnitude : K
H
=
Operating load : W = N(product mass×9.8)
Horizontal earthquake force
: F
H
= K
H
W= N
Height of center of gravity
: h
G
=
mm
Vertical earthquake force
: F
V
=
F
H
/2= N
Short direction
Long direction
Bolt span
No. of bolts
Pull out load
l
1
= mm
n
1
= bolts
R
b1
= N
l
2
= mm
n
2
= bolts
R
b2
= N
Pull out load
Shear force
Tensile stress
R
b1
= N R
b1
< T
a
(= N/bolt)
=F
H
/N A= N/mm
2
< f
s
(= 132×0.75N/mm
2
)
1
=R
b1
/A= N/mm
2
1
< f
t
(= 176N/mm
2
)
f
ts
= 1.4f
t
-1.6
= N/mm
2
1
< f
ts
= N/mm
2
R
b2
= N
R
b2
< T
a
(= N/bolt)
=F
H
/N A= N/mm
2
< f
s
(= 132×0.75N/mm
2
)
1
=R
b2
/A= N/mm
2
2
< f
t
(= 176N/mm
2
)
f
ts
=1.4f
t
-1.6 = N/mm
2
2
< f
ts
= N/mm
2
Judgment
OK
NG
OK
NG
Calculation formulae
Pull out load
R
b
: Pull out load (N)(short direction: R
b1
, long direction: R
b2
)
R
b
=
l
: Bolt span (mm) (short direction:
l
1
, long direction:
l
2
)
n : No. of bolts (short direction: n
1
, long direction: n
2
)
l
G
: Distance to CofG (mm) (short direction:
l
G1
, long direction:
l
G2
)
However,
l
G
l
/2
Allowable tensile stress in bolt subjected to simultaneous shear stress
f
ts
= 1.4f
t
-1.6
f
ts
:
Allowable tensile stress in bolt simultaneously subject to shear stress (N/mm
2
)
f
t
:Allowable tensile stress in bolt subject to tensile stress only (N/mm
2
)
Reference: The material SS400 short term allowable tensile stress ft
176 N/mm
2
,
SS400 short term allowable shear stress 132×0.75 N/mm
2
<Calculation dimensions>
F
H
h
G
- (W -F
V
)
l
G
l
n
h
Short direction
(front)
l
1
l
G1
G
l
2
l
G2
G
Long direction
π
τ
τ
τ
τ
τ
τ
τ
σ
σ
σ
σ
σ
σ
Installation
location
Design horizontal
magnitude K
H
On the roof
1.0
On the ground
0.4
7. Center of gravity position and earthquake resistant design
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...