Design
D - 6
: Header piping (separately sold item)
: Branch piping (separately sold item)
: T-branch (supply on site)
: Seal (pinch ) weld
Separation distance from flammable material (cm)
Outdoor unit
T-branch
piping
Unit main piping
(between unit and branch)
Unit main piping
First branch
Unit branch piping
Indoor unit
Under 4m
Over 2x
Over 4m
* Limitation on the difference in maximum
and minimum height of the indoor units
after the final branch
Outdoor unit
70 type
90 type
120 type
150 type
190 type
Indoor unit individual operation
Indoor unit capacity as a percentage of the
outdoor unit capacity
50-200%
Minimum connected indoor unit capacity
22 type (0.8 HP) or greater
Maximum no. of indoor units that can be
connected (per system)
20 units(*1)
24 units
Maximum allowable piping length (L)
L
1
120m or less (effective length 145m or less)(*2)
Difference between maximum length
and minimum length after the first
branch
L
2
-L
4
30m or less
Maximum length of each branch
l
1
.l
2
…l
8
30m or less
Outdoor unit
higher
H
1
50m or less
Maximum height
difference
between outdoor
and indoor units
Outdoor unit lower
H
2
35m or less (*3)
Maximum height difference between
indoor units
H
2
15m or less (*4)
Maximum length from the first
T-branch to the last T-branch
L
3
2m or less
(1) Selection of refrigerant piping
1
Limit on refrigerant piping length
Select the installation location so that the refrigerant piping length is within the ranges shown in the following table. (values
for each independent refrigeration system)
Table 1
*1
Up to 24 indoor units with a total capacity in the range 50-200% of the capacity of the outdoor units can be connected. (for the type 70 unit, as
21 type 22 units (the smallest capacity indoor unit) comes out to 462 and exceeds 200%, the maximum no. of units that can be connected is 21.)
*2
The minimum piping length from the outdoor unit to an indoor unit is 7m.
*3
If operating the cooler when the external air temperature is 10
o
C or less, then position them so that the value is 30m or less.
*4
Install the indoor units after the final branch so that the limitation on difference between maximum and minimum height shown in the diagram
below is satisfied.
Note
1. Cautions regarding the piping for the separately sold branches
( ) and headers are contained in the packaging for
these separately sold items. Be certain to refer to these
notes.
2. The direction to install the T-branch on site (L3 less than 2m
only) is as follows. The main pipe can be vertical or
horizontal. If the main pipe is horizontal then the opening
from the branch should be at a plus angle to the horizontal.
If the main pipe is vertical then the direction of the opening
of the branch does not matter, but a rising part should be
attached once to the branch piping. Carry out a sealing weld
on the end of the T-branch. Also, be careful of the
dimensions of the inserted pipes so as to not clog the
refrigerant flow. Only use commercial T-branches.
Indoor
Indoor
Indoor
Indoor
Outdoor
Outdoor
Horizontal line
Make a plus angle
Seal weld
Seal weld
Free angle
3. Do not use commercially available Y-branches ( ) for the
liquid pipes (provided at site).
3. Refrigerant piping design
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...