Water heat exchange unit
H - 24
8. Position of center of gravity and earthquake resistance calculation
(1) Installation fixing position and center of gravity position
1
Position of center of gravity
2
Anchor bolt calculations
●
Evaluation by calculation
Foundation bolt conditions
Total no. of bolts(N
)
N
=
㩷 㩷
4
㩷
No.
No.
No.
………..current models have 4 bolts
bolt diameter(D
)
D
=
㩷 㩷
10 mm ………..for M10 bolts
bolt cross-sectional area(A
)
A
=
D
2
/4 =
㩷
79 mm
2
bolts on one side
䋺
short direction(n
1
)
n
1
=
㩷
2
㩷 㩷
………..current models have 2 bolts
㩷 㩷 㩷 㩷 㩷 㩷
long direction(n
2
)
n
2
=
㩷
2
㩷 㩷
………..current models have 2 bolts
The installation method is “embedded J type, JA type bolts”, on a slab 15cm thick.
Foundation bolt allowable short term tensile load(T
a
)
T
a
=
㩷
4,508
㩷
N
(It is also acceptable to decide the installation method after completing the calculation
)
Calculation
Design horizontal magnitude(K
H
)
K
H
=
㩷
1.0
㩷 㩷
………..installation location:K
H
on roof: 1.0
㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷
on ground:0.4
Operating load(W
)
W
=
㩷
㩷
N
(=operating mass×9.8
)
Horizontal earthquake force(F
H
)
F
H
= K
H
䊶
W=
㩷 㩷
N
N
㩷
Height of center of gravity(h
)
h
G
=
㩷
mm
Vertical earthquake force(F
V
)
F
V
=F
H
/2=
㩷
1
2
π
Position of fastenings
Position of center of gravity
Outdoor unit
type
l
1
l
2
l
G 1
l
G 2
h
G
Product
mass
(kg)
WE80 type
1,040 460
WE170 type
1,040 460
Left side view
l
G1
G
l
1
G
Front view
h
h
G
l
G2
l
2
G
Содержание SGP-E120J2GU2
Страница 19: ...Outdoor Unit B 14 290 Type Performance characteristics of SGP E90J2GU2 5 Performance characteristics ...
Страница 20: ...Outdoor Unit B 15 3120 Type Performance characteristics of SGP E120J2GU2 5 Performance characteristics ...
Страница 21: ...Outdoor Unit B 16 4150 Type Performance characteristics of SGP E150J2GU2 5 Performance characteristics ...
Страница 22: ...Outdoor Unit B 17 5190 Type Performance characteristics of SGP E190J2GU2 5 Performance characteristics ...
Страница 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Страница 87: ...Design D 43 8 Salt resistant specification ...
Страница 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Страница 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Страница 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Страница 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Страница 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Страница 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Страница 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Страница 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Страница 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Страница 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Страница 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Страница 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Страница 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Страница 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Страница 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Страница 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Страница 127: ...Construction E 40 5 Commissioning ...
Страница 128: ...Construction E 41 5 Commissioning ...
Страница 129: ...Construction E 42 5 Commissioning ...
Страница 130: ...Construction E 43 5 Commissioning ...
Страница 131: ...Construction E 44 5 Commissioning ...
Страница 132: ...Construction E 45 5 Commissioning ...
Страница 133: ...Construction E 46 5 Commissioning ...
Страница 134: ...Construction E 47 5 Commissioning ...
Страница 135: ...Construction E 48 5 Commissioning ...
Страница 136: ...Construction E 49 5 Commissioning ...
Страница 137: ...Construction E 50 5 Commissioning ...
Страница 138: ...Construction E 51 5 Commissioning ...
Страница 139: ...Construction E 52 5 Commissioning ...
Страница 140: ...Construction E 53 5 Commissioning ...
Страница 141: ...Construction E 54 5 Commissioning ...
Страница 142: ...Construction E 55 5 Commissioning ...
Страница 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Страница 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Страница 154: ...Water heat exchange unit H 4 2 System characteristics Water heat exchanger unit connection limitations ...
Страница 155: ...Water heat exchange unit H 5 3 External view ...
Страница 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Страница 160: ...Water heat exchange unit H 10 4 Specification 4 Power characteristics 1Performance characteristics graph ...
Страница 161: ...Water heat exchange unit H 11 4 Specification ...