background image

Gas Conversion Kit

Individual / Zone Controlled

 Radiant Brooders

View these instructions online at www.lbwhite.com

Tools required:

Phillips- head screwdriver
Adjustable wrench
Hand held butane torch

ASSEMBLY and INSTALLATION INSTRUCTIONS

Qualifications for installation:

• 

 You must be able to read and understand these instructions.

• 

 You must have suffi cient training and experience to install the kit.

• 

You must be able to test the brooder for proper operation.

Discussion:

These instructions are specifi c to radiant brooders models I-17 with D design sequence level in the model number (example: 
I17P11000D). Refer to the brooder’s clearance and data plate disk.

Initial Preparation:

1. 

Ensure 5 PSIG is supplied to all brooders. Appropriate regulators must be installed if necessary.

2. 

Close the fuel supply valve and allow all heaters to cool.

3. 

Remove the brooder’s fi lter.

4. 

Disconnect the brooder’s gas hose.

5. 

Clean the brooder and its fi lter. Refer to the brooder’s owner’s manual for instructions.

Conversion:

1.  Disassemble the brooder as shown in Fig. 1 (Individual controlled brooder) or Fig. 2 (Zone controlled brooder)

FIG. 1 (Individual Controlled)

MODULATING

VALVE BODY

LOOSEN

NUT

DISCONNECT 

THERMOCOUPLE

SOFT FLAME

BYPASS
ORIFICE

CLEARANCE 

AND DATA 

PLATE DISK

REMOVE SCREW 

AND RETAINER 

CLIP

AIR HOUSING

Отзывы: