Gas Conversion Kit

Gas Conversion Kit •Individual and Zone Controlled Radiant Brooders

3

Conversion:

1. Reconnect the gas hose to the brooder, tightening it securely.

2. Ensure proper hanging confi guration. See the back of this instruction sheet.

3. Open the fuel supply valve and leak check using approved leak detectors.

4. Light the brooders and check for proper operation.

5.  Set the second stage regulator to ensure proper gas supply pressure to all heaters in the zone. Check pres-

sure at maximum and minimum heat output. Refer to Clearance and Data Plate disk on brooder or to zone 
panel.

6.  When steps 1 – 5 are complete, set the temperature control on the zone panel or on individual control brood-

ers to desired setting. 

7. Keep these instructions for future use.

ATTENTION:

•  Ensure the brooder is hung so its control is positioned 10 to 50 down from horizontal after the gas supply hose 

is attached. This allows proper venting of the brooder and prevents potential heat damage to the fi lter.

• Repositioning of the hanging brackets key ring may be required to achieve proper hanging position.

Installation Layout for Safe Clearances:

INSTALLATION LAYOUT 

FOR SAFE CLEARANCES

I17  - 3 FT. MINIMUM

BROODER TOP TO CEILING

POSITION THE GAS HOSE AND ELECTRICAL POWER CORD
OUTSIDE OF THE HOT ZONE DIRECTLY ABOVE THE HEATER.
POSITION THE GAS HOSE AND POWER CORD TO AVOID 
ANY OPPORTUNITY FOR CONTACT WITH THE HOT CANOPY
SURFACE OF THE HEATER.

MINIMUM 3 FT. CLEARANCE

TO COMBUSTIBLES

FLOOR

I17 - 3.5 FT. MINIMUM

POINT OF COMBUSTION 

CONE TO FLOOR

HANG THE HEATER WITH THE 
CONTROL END 1 TO 5 DEGREES DOWN 
FROM HORIZONTAL (SEE BELOW)

CONTROL PANEL

GAS PIPING

THIS

NOT THIS

CONTROL END 

KEYRING

STEEL CABLE

HANGING 

CONTROL END

OR CHAIN

BRACKET

OF HEATER

MUST BE 1  TO 5 DOWN

FROM HORIZONTAL