Installation of the Control Panel
3-24
Chapter 3: Installation
98-136280-B
Ground stud at the ACU
To ensure that the ACU is grounded – also if the ADU cable is disconnected from the
ACU, connect an extra ground wire from the rack to the ground stud on the ACU. This
ground wire must be a heavy wire or braid cable with a larger diameter than the coax
cable.
3.5
Installation of the Control Panel
For instructions how to install the Control Panel see the installation manual for the
Control Panel, see the table
To connect the Control Panel to the ACU do as shown below:
1. Connect an Ethernet cable to the Ethernet connector at the back of the Control
Panel.
2. Connect the other end of the Ethernet to LAN 4 of the ACU (rear connector panel),
possibly through a switched network.
Figure 3-23: ACU, ground stud
Figure 3-24: Connecting the Control Panel to the ACU, LAN4
Important
If the Control Panel is connected directly to the ACU, you must enable
DHCP Server on LAN 4, see
ACC
AUX
TEST
PWR
on ACU
Connect to
Ethernet on
LAN 4 on ACU.
SAILOR100IM.book Page 24 Friday, January 18, 2013 10:28 AM
Содержание 100
Страница 1: ...INSTALLATION MANUAL SAILOR 100 Satellite TV ...
Страница 2: ......
Страница 8: ...vi 98 136280 B SAILOR100IM book Page vi Friday January 18 2013 10 28 AM ...
Страница 140: ...Troubleshooting 8 14 Chapter 8 Service 98 136280 B SAILOR100IM book Page 14 Friday January 18 2013 10 28 AM ...
Страница 141: ...Appendices SAILOR100IM book Page 1 Friday January 18 2013 10 28 AM ...
Страница 142: ...SAILOR100IM book Page 2 Friday January 18 2013 10 28 AM ...
Страница 174: ...List of ACU events C 10 Appendix C System messages 98 136280 B SAILOR100IM book Page 10 Friday January 18 2013 10 28 AM ...
Страница 178: ...Glossary Glossary 4 98 136280 B SAILOR100IM book Page 4 Friday January 18 2013 10 28 AM ...
Страница 185: ......
Страница 186: ...info thrane com thrane com 98 136280 B ...