Site preparation
98-136280-B
Chapter 3: Installation
3-3
3333
In
stall
ati
o
n
3.2
Site preparation
The following topics have to be considered when installing the ADU:
•
•
•
Blocking zones — azimuth and elevation
•
Ship motion and offset from the ship’s motion centre
•
ADU mast design: Foundation and height
•
•
3.2.1
General site considerations
For optimum system performance, some guidelines on where to install or mount the
different components of the SAILOR 100 Satellite TV System must be followed.
It is recommended to mount the ADU in a location with as much
360° free line of sight
to the satellite
as possible while making sure that the support structure fulfills the
requirements for the mast foundation. The ADU must be mounted on stiffened
structures with a minimum of exposure to vibrations.
SAILOR100IM.book Page 3 Friday, January 18, 2013 10:28 AM
Содержание 100
Страница 1: ...INSTALLATION MANUAL SAILOR 100 Satellite TV ...
Страница 2: ......
Страница 8: ...vi 98 136280 B SAILOR100IM book Page vi Friday January 18 2013 10 28 AM ...
Страница 140: ...Troubleshooting 8 14 Chapter 8 Service 98 136280 B SAILOR100IM book Page 14 Friday January 18 2013 10 28 AM ...
Страница 141: ...Appendices SAILOR100IM book Page 1 Friday January 18 2013 10 28 AM ...
Страница 142: ...SAILOR100IM book Page 2 Friday January 18 2013 10 28 AM ...
Страница 174: ...List of ACU events C 10 Appendix C System messages 98 136280 B SAILOR100IM book Page 10 Friday January 18 2013 10 28 AM ...
Страница 178: ...Glossary Glossary 4 98 136280 B SAILOR100IM book Page 4 Friday January 18 2013 10 28 AM ...
Страница 185: ......
Страница 186: ...info thrane com thrane com 98 136280 B ...