Installation check list: Antenna
7-2
Chapter 7: Installation check
98-136280-B
7.
Make sure that the
requirements for mast
foundation and height,
including flatness, gusset
plates and distance from
welding seams are met.
See
8.
Make sure that the distances to
radar, Inmarsat systems, GPS
receivers and other
transmitters are as required.
See
9.
Make sure that the drain tube
is open and risk for water
intrusion is at a minimum.
See
10.
Check that the ADU is
grounded correctly, using the
mounting bolts.
See
and
Step
Task
Further information
Done
Table 7-1: Installation check list: Antenna (Continued)
SAILOR100IM.book Page 2 Friday, January 18, 2013 10:28 AM
Содержание 100
Страница 1: ...INSTALLATION MANUAL SAILOR 100 Satellite TV ...
Страница 2: ......
Страница 8: ...vi 98 136280 B SAILOR100IM book Page vi Friday January 18 2013 10 28 AM ...
Страница 140: ...Troubleshooting 8 14 Chapter 8 Service 98 136280 B SAILOR100IM book Page 14 Friday January 18 2013 10 28 AM ...
Страница 141: ...Appendices SAILOR100IM book Page 1 Friday January 18 2013 10 28 AM ...
Страница 142: ...SAILOR100IM book Page 2 Friday January 18 2013 10 28 AM ...
Страница 174: ...List of ACU events C 10 Appendix C System messages 98 136280 B SAILOR100IM book Page 10 Friday January 18 2013 10 28 AM ...
Страница 178: ...Glossary Glossary 4 98 136280 B SAILOR100IM book Page 4 Friday January 18 2013 10 28 AM ...
Страница 185: ......
Страница 186: ...info thrane com thrane com 98 136280 B ...