1. OUTLINE
IIMS01J02-E2
2
1.2 Handling Procedures
Conduct handling according to the procedure described below.
Checking the products
See
1.3 Checking the Products (P. 3)
See
1.4 Confirmation of the Model Code (P. 4)
Mounting
See
3. MOUNTING (P. 20)
Settings prior to
operation
Power supply/ground
wiring
See
4.1 WIRING (P. 25)
SHARP JW50H/70H/100H and JW30H
OMRON SYSMAC series
MITSUBISHI MELSEC series
Connection to the PLC
Multiple control unit connections
Connection to the touch panel
Connection to the operation panel
Connection to the host computer
See
P. 28
DO connector connection
Connections
Start-up procedures
See
5.3 Start-up Procedures (P. 49)
Operations
See
P. 30
See
P. 37
See
P. 38
See
P. 41
See
PLC Communication Instruction Manual
[For MITSUBISHI PLC] (IMS01J03-E )
PLC communication
RKC and MODBUS communication
Unit Address Setting
Protocol Selection and Host Communication Setting
SHARP JW50H/70H/100H and JW30H
OMRON SYSMAC series
MITSUBISHI MELSEC series
See
P. 43
See
P. 48
Current transformer (CT) monitor
Current transformer (CT) monitor
LG MASTER-K and GLOFA-GM series
LG MASTER-K and GLOFA-GM series
See
PLC Communication Instruction Manual
[For OMRON PLC] (IMS01J04-E )
See
PLC Communication Instruction Manual
[For SHARP PLC] (IMS01J05-E )
See
PLC Communication Instruction Manual
[For LG PLC] (IMS01J06-E )
See
PLC Communication Instruction Manual
[For MITSUBISHI PLC] (IMS01J03-E )
See
PLC Communication Instruction Manual
[For OMRON PLC] (IMS01J04-E )
See
PLC Communication Instruction Manual
[For SHARP PLC] (IMS01J05-E )
See
PLC Communication Instruction Manual
[For LG PLC] (IMS01J06-E )