4.22  Replacing the 

MAIN PCB

 board

The system configuration operations need to be carried out by professionally qualified 

personnel of the Technical Assistance Centre. The systems continually carries out a 

consistency control between the configuration data saved on the MAIN PCB electronic board 

and that saved in the REC; therefore, when replacing the MAIN PCB electronic board, it might 

happen that the system detects an inconsistency between the data saved on the MAIN PCB 

and that in the REC. In this case, the latter will ask the user which of the two configurations is to 

be considered valid; selecting to recuperate the configuration from the REC itself it is possible 

to avoid reconfiguring the machine:

 

-

select REC10CH.

MAIN PCB

REC10

SELECT THE TYPE OF 

CONFIGURATION

4.23  Combustion Control Parameters

Even if the parameters regarding the new ACC combustion control system (active 

combustion control) are preset in the factory, it might be necessary to programme them, this 

is in the case where both electronic boards (MAIN PCB and REC10CH MASTER) need to 

be replaced at the same time.

 

-

set SERVICE password

 

-

select TECHNICAL 

 COMBUSTION MONITORING

ERROR HISTORY

EXHAUST PROBE RESET

AIR PURGING CYCLE

PARAMETERS

COMBUSTION MONITORING

SERVICE

TECHNICAL

 

-

select GAS TYPE

 

-

set depending on the type of gas of the boiler: MTN = METHANE - GPL = LPG

BOILER TYPE

COMBUSTION OFFSET

GAS TYPE

SERVICE

COMBUSTION MONITORING

 

-

select BOILER TYPE and schedule as shown in the table

A

B

C

SERVICE

BOILER TYPE

...

BOILER TYPE

Family 25 KIS

A

Family 30 KIS

B

Family 35 KIS

G

 

-

select COMBUSTION OFFSET

RESET

RESTORE

SERVICE

COMBUSTION OFFSET

RESTORE

: select this option when replacing the MAIN PCB electronic board

RESET

: select this option when replacing the detector electrode.

 

b

If after maintenance work on the elements of the combustion unit (repositioning 

the detector electrode or else replacing/cleaning the primary heat exchanger, 

condensate  siphon,  fan,  burner,  flue  gases  conveyor,  gas  valve,  gas  valve 

diaphragm), the boiler generates one or more alarms regarding combustion faults, 

we recommend setting the main system switch to off for at least 5 minutes in these 

cases we recommend setting the main system switch to off for at least 5 minutes.

COMBUSTION SELF-CALIBRATION

Function used by the after sales service to make an automatic combustion bend correction if 

the CO

2

 values (shown in the technical data) are outside the permitted range.

 

-

Power the boiler electrically by bringing the main switch to “ON”.

 

-

Set the boiler status to OFF.

 

-

Select TECHNICAL 

 COMBUSTION CONTROL 

 SELF-CALIBRATION

 

-

Set the values to:

  RESTORE = use the old bend (if the CO

2

 value is too high)

  RESET = use the new bend (if the CO

2

 value is too low).

This parameter is only available when the system is OFF.

4.24  Maintenance and cleaning 

Periodic maintenance is an “obligation” required by the law and is essential to the safety, 

efficiency  and  duration  of  the  boiler.  It  allows  for  the  reduction  of  consumption,  polluting 

emissions and keeping the product reliable over time. Before starting maintenance operations:

 

-

close the fuel and water taps of the heating and domestic hot water system.

To  ensure  product  characteristics  and  efficiency  remain  intact  and  to  comply  with 

prescriptions of current regulations, it is necessary to render the appliance to systematic 

checks at regular intervals. When carrying out maintenance work, observe the instructions 

given in the “WARNINGS AND SAFETY” chapter. This normally means the following tasks:

 

-

removing any oxidation from the burner

 

-

removing any scale from the heat exchangers

 

-

checking electrodes

 

-

checking and cleaning the drainage pipes

 

-

checking the external appearance of the boiler

 

-

checking the ignition, switch-off and operation of the appliance, in both domestic water 

mode and heating mode

 

-

checking the seal on the couplings, gas and water and condensate connecting pipes

 

-

checking the gas consumption at maximum and minimum output

 

-

checking the position of the ignition electrode

 

-

checking the position of the detector electrode/ionisation probe (see specific paragraph)

 

-

checking the gas failure safety device.

 

b

During boiler maintenance the use of protective clothing is recommended, in order 

to avoid personal injury.

 

b

After carrying out the maintenance operations the analysis of the combustion 

products needs to be carried out to make sure it is operating correctly.

 

b

If, after replacing the electronic board or having carried out maintenance on the 

detector electrode or the burner, the analysis of the combustion products returns 

values outside tolerances, it might necessary to change these values as described in 

the section “4.23 Combustion Control Parameters”. 

  

Note

: When replacing the electrode there could be slight variations of the combustion 

parameters that fall within nominal values after a few hours of operation.

 

b

Do not clean the appliance or its parts with inflammable substances (e.g. petrol, 

alcohol, etc.).

 

b

Do not clean panels, painted parts and plastic parts with paint thinner.

 

b

Panel cleaning must be carried out only with soapy water.

Cleaning the primary heat exchanger and the burner

 

-

Switch off the electrical supply by turning the system’s main switch to “Off”.

 

-

Close the gas shut-off valve.

 

-

Remove the casing as indicated in the paragraph “2.6 Removing the casing”.

 

-

Disconnect the connecting cables of the electrodes.

 

-

Disconnect the power cables of the fan.

 

-

Take out the clip (

A

) of the mixer.

 

-

Loosen the nut of the gas train (

B

).

 

-

Take out and turn the gas train.

 

-

Remove the 4 nuts (

C

) that fix the combustion uni.t

 

-

Take out the air/gas conveyor assembly including the fan and mixer, being careful not to 

damage the insulating panel and the electrodes.

A

B

C

  Primary heat exchanger

 

-

Remove the siphon connecting pipe from the condensate drain fitting of the heat 

exchanger and connect a temporary collecting pipe. At this point proceed with the heat 

exchanger cleaning operations.

 

-

Vacuum out any dirt residues inside the heat exchanger, being careful NOT to damage 

the retarder insulating panel.

 

-

Clean the coils of the heat exchanger with a soft bristled brush.

 

b

DO NOT USE METAL BRUSHES THAT COULD DAMAGE THE COMPONENTS.

 

-

Clean the spaces between the coils using 0.4 mm thick blade, also available in a kit.

 

-

Vacuum away any residues produced by the cleaning.

 

-

Rinse with water, being careful NOT to damage the retarder insulating panel.

 

-

Make sure the retarder insulation panel is undamaged and replace it if necessary 

following the relative procedure.

 

-

Once the cleaning operations are finished, carefully reassemble all the components, 

following the above instructions in the reverse order.

Содержание 20187642

Страница 1: ...Family KIS EN INSTALLER AND USER MANUAL...

Страница 2: ...ser also Warning This instructions manual contains data and information for both the user and the installer Specifically note that the user for the use of the appliance must refer to chapters Warnings...

Страница 3: ...this case ventilate the room by opening the doors and windows close the fuel shut off device ask the Technical Assistance Service or professionally qualified personnel to intervene promptly a It is f...

Страница 4: ...pe and consider any increase in the diameter of the pipe itself The condensation exhaust pipe must always have an adequate slope level to prevent the condensation from stagnating and its proper draina...

Страница 5: ...and immediately before and after each change of direction curve b The boiler is supplied without the flue gas exhaust air suction kit since it is possible to use the accessories for condensing applia...

Страница 6: ...e can exceed the static pressure of the collective air duct of 25 Pa in the condition in which n 1 boilers work at maximum rated heat input and 1 boiler at the minimum rated heat input allowed by the...

Страница 7: ...e vent cycle Remove any air in the domestic system radiators zone manifolds etc using the bleed valves Once again check that the system pressure is correct ideally 1 1 5 bar and restore the levels if...

Страница 8: ...is in progress number 1 is flashing This icon indicates that the circuit for domestic hot water production is enabled When a domestic hot water request is in progress the icon flashes The P at the to...

Страница 9: ...LER CHANGE NAME INSTALLER PI PROPORTIONAL 5 0 99 SERVICE only mixing zones with ACTUATION BE16 PI INTEGRAL 10 0 99 SERVICE only mixing zones with ACTUATION BE16 VALVE RUN 120 sec 0 sec 120 sec SERVICE...

Страница 10: ...request type TA and zone type HT 0 4 0 2 0 8 INSTALLER if EXTERNAL PROBE request type TA and zone type LT 2 0 1 0 5 0 INSTALLER if request type AMBIENT PROBE or REC10CH AMBIENT INFLUENCE 10 0 20 INSTA...

Страница 11: ...DISABLE COOLING FUNCTION NOT ACTIVE FUNCTION ACTIVE FUNCTION NOT ACTIVE INSTALLER USE FOR DHW DON TUSE FOR DHW DHW FUNCTION NOT ACTIVE DHW FUNCTION ACTIVE DHW FUNCTION NOT ACTIVE INSTALLER if BE17 pre...

Страница 12: ...t it has all the safety and control devices required by current regulations that the circulator rotates freely because especially after long periods of inactivity deposits and or debris can prevent fr...

Страница 13: ...ZONE PARAMETERS WEATHER COMPENSATION INSTALLATION RANGE RATED CALIBRATION INSTALLER TECHNICAL SENSOR CALIBRATION ZONES MANAGER SYSTEM RESET INSTALLER INSTALLATION ADD ZONE MODIFY ZONE DELETE ZONE INS...

Страница 14: ...URE C EXTERNAL TEMPERATURE C NIGHT COMPENSATION If a timer is connected to the ROOM THERMOSTAT input the NIGHT COMP function can be enabled as follows menu TECHNICAL WEATHER COMPENSATION CLIMATIC CURV...

Страница 15: ...in standby again keeping the outlet temperature displayed If faults arise in ignition or operations the boiler performs a SAFETY STOP the triangle signalling faults will flash on the REC10CH To identi...

Страница 16: ...Technical Assistance Centre 4 13 Gas conversion Conversion from a family gas to other family gas can be performed easily also when the boiler is installed This operation must be carried out by profes...

Страница 17: ...l E042 water pressure transducer fault definitive E060 domestic hot water probe fault transitional E070 flow sensor faulty flow sensor overtemperature flow return sensor differential alarm transitiona...

Страница 18: ...TECHNICAL Note After a reset it is necessary to carry out a new configuration of the system for details about this procedure see the following section 4 19 System configuration b This operation must b...

Страница 19: ...in intact and to comply with prescriptions of current regulations it is necessary to render the appliance to systematic checks at regular intervals When carrying out maintenance work observe the instr...

Страница 20: ...nnect the tubes A and B remove the clip C and remove the siphon Unscrew the bottom and top caps then remove the float Clean the parts of the siphon from any solid residues b Do not remove the safety s...

Страница 21: ...EFAULT VALUE FACTORY SET MINIMUM VALUE MAXIMUM VALUE ACCESS LEVEL NOTES MENU SETTINGS USER TIME DATE USER DAYLIGHT SAVINGS TIME FUNCTION ACTIVE FUNCTION NOT ACTIVE FUNCTION ACTIVE USER LANGUAGE ITALIA...

Страница 22: ...ed programme 8 2 3 MANUAL If MANUAL is selected the zone requests will be managed based on the setpoint set by the user 8 2 4 HEAT OFF If HEAT OFF is selected the zone requests will not be fulfilled N...

Страница 23: ...0 INFO The INFO function can be used to display a series of data regarding the system ATTENTION The displayed data cannot be modified SCREED HEATER OPERATING HOURS DELIVERY PROBE RETURN PROBE DOMESTIC...

Страница 24: ...TART THURSDAY USE THE ARROWS TO MODIFY ENTER START TIME ADD PERIOD END MAIN Once the operation completed the display will show 07 30 08 30 11 30 14 00 13 30 15 00 18 00 22 30 START THURSDAY ADD MODIFY...

Страница 25: ...TURE WILL BE ADJUSTED WITH NEW TARGET SET POINT UNTIL 09 04 2021 ON 13 15 1 ZONE1 CONFIRM CANCEL 00 30 YOU ARE ACTIVATING COMFORT MODE ENTER TIME DURATION IN HOURS USE THE ARROWS TO MODIFY 1 ZONE1 26...

Страница 26: ...Maximum pressure bar 8 8 8 Minimum pressure bar 0 15 0 15 0 15 Quantity of hot water with t 25 C 30 C 35 C l min 15 1 12 5 10 8 18 1 15 1 12 9 20 8 17 4 14 9 DHW minimum capacity l min 2 2 2 Selectio...

Страница 27: ...ith reference to Delegated Regulation EU No 811 2013 the data in the table can be used for completing the product card and the labelling for ambient heating appliances for mixed heating appliances for...

Страница 28: ...ivery 34 Hot water 35 Gas 36 Heating return 37 Cold water 2 21 AF AC M R 20 19 1 6 6 8 9 5 4 6 7 3 2 18 15 14 13 12 11 10 16 17 15 3 Residual head of circulator Fig 3 A B C Residual head mbar Flow rat...

Страница 29: ...entering a value 10 the circulator speed will change to achieve a system flow rate with the aim of maintain ing the T of 10 C upstream and down stream of the exchanger 3 CIRCULATOR IN MAXIMUM FIXED S...

Страница 30: ...Wiring diagram Blu Blue Marrone Brown Nero Black Rosso Red Bianco White Viola Violet Rosa Pink Arancione Orange Grigio Grey Giallo Yellow Verde Green A Gas valve B 230V auxiliary C Voltage free contac...

Страница 31: ...from 60 100 to 80 80 110 65 65 1 1 5 90 bend 60 100 60 100 horizontal 10 horizontal 6 horizontal 6 1 3 1 6 105 vertical 11 vertical 7 vertical 7 90 bend 80 125 80 125 25 15 15 1 1 5 130 adaptor from 6...

Страница 32: ...T OPTION 4 and SYSTEM INFO INSTALLATION WEATHER COMPENSATION RANGE RATED TECHNICAL INSTALLER 5 PARAMETERS CALIBRATION and ANTI CYCLE FUNCTION RESET CH TIMERS DHW THERMOSTAT PARAMETERS INSTALLER 6 PUMP...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ...Cod 20187595 09 21 Ed 3...

Отзывы: