4.22 Replacing the
MAIN PCB
board
The system configuration operations need to be carried out by professionally qualified
personnel of the Technical Assistance Centre. The systems continually carries out a
consistency control between the configuration data saved on the MAIN PCB electronic board
and that saved in the REC; therefore, when replacing the MAIN PCB electronic board, it might
happen that the system detects an inconsistency between the data saved on the MAIN PCB
and that in the REC. In this case, the latter will ask the user which of the two configurations is to
be considered valid; selecting to recuperate the configuration from the REC itself it is possible
to avoid reconfiguring the machine:
-
select REC10CH.
MAIN PCB
REC10
SELECT THE TYPE OF
CONFIGURATION
4.23 Combustion Control Parameters
Even if the parameters regarding the new ACC combustion control system (active
combustion control) are preset in the factory, it might be necessary to programme them, this
is in the case where both electronic boards (MAIN PCB and REC10CH MASTER) need to
be replaced at the same time.
-
set SERVICE password
-
select TECHNICAL
COMBUSTION MONITORING
ERROR HISTORY
EXHAUST PROBE RESET
AIR PURGING CYCLE
PARAMETERS
COMBUSTION MONITORING
SERVICE
TECHNICAL
-
select GAS TYPE
-
set depending on the type of gas of the boiler: MTN = METHANE - GPL = LPG
BOILER TYPE
COMBUSTION OFFSET
GAS TYPE
SERVICE
COMBUSTION MONITORING
-
select BOILER TYPE and schedule as shown in the table
A
B
C
SERVICE
BOILER TYPE
...
BOILER TYPE
Family 25 KIS
A
Family 30 KIS
B
Family 35 KIS
G
-
select COMBUSTION OFFSET
RESET
RESTORE
SERVICE
COMBUSTION OFFSET
RESTORE
: select this option when replacing the MAIN PCB electronic board
RESET
: select this option when replacing the detector electrode.
b
If after maintenance work on the elements of the combustion unit (repositioning
the detector electrode or else replacing/cleaning the primary heat exchanger,
condensate siphon, fan, burner, flue gases conveyor, gas valve, gas valve
diaphragm), the boiler generates one or more alarms regarding combustion faults,
we recommend setting the main system switch to off for at least 5 minutes in these
cases we recommend setting the main system switch to off for at least 5 minutes.
COMBUSTION SELF-CALIBRATION
Function used by the after sales service to make an automatic combustion bend correction if
the CO
2
values (shown in the technical data) are outside the permitted range.
-
Power the boiler electrically by bringing the main switch to “ON”.
-
Set the boiler status to OFF.
-
Select TECHNICAL
COMBUSTION CONTROL
SELF-CALIBRATION
-
Set the values to:
RESTORE = use the old bend (if the CO
2
value is too high)
RESET = use the new bend (if the CO
2
value is too low).
This parameter is only available when the system is OFF.
4.24 Maintenance and cleaning
Periodic maintenance is an “obligation” required by the law and is essential to the safety,
efficiency and duration of the boiler. It allows for the reduction of consumption, polluting
emissions and keeping the product reliable over time. Before starting maintenance operations:
-
close the fuel and water taps of the heating and domestic hot water system.
To ensure product characteristics and efficiency remain intact and to comply with
prescriptions of current regulations, it is necessary to render the appliance to systematic
checks at regular intervals. When carrying out maintenance work, observe the instructions
given in the “WARNINGS AND SAFETY” chapter. This normally means the following tasks:
-
removing any oxidation from the burner
-
removing any scale from the heat exchangers
-
checking electrodes
-
checking and cleaning the drainage pipes
-
checking the external appearance of the boiler
-
checking the ignition, switch-off and operation of the appliance, in both domestic water
mode and heating mode
-
checking the seal on the couplings, gas and water and condensate connecting pipes
-
checking the gas consumption at maximum and minimum output
-
checking the position of the ignition electrode
-
checking the position of the detector electrode/ionisation probe (see specific paragraph)
-
checking the gas failure safety device.
b
During boiler maintenance the use of protective clothing is recommended, in order
to avoid personal injury.
b
After carrying out the maintenance operations the analysis of the combustion
products needs to be carried out to make sure it is operating correctly.
b
If, after replacing the electronic board or having carried out maintenance on the
detector electrode or the burner, the analysis of the combustion products returns
values outside tolerances, it might necessary to change these values as described in
the section “4.23 Combustion Control Parameters”.
Note
: When replacing the electrode there could be slight variations of the combustion
parameters that fall within nominal values after a few hours of operation.
b
Do not clean the appliance or its parts with inflammable substances (e.g. petrol,
alcohol, etc.).
b
Do not clean panels, painted parts and plastic parts with paint thinner.
b
Panel cleaning must be carried out only with soapy water.
Cleaning the primary heat exchanger and the burner
-
Switch off the electrical supply by turning the system’s main switch to “Off”.
-
Close the gas shut-off valve.
-
Remove the casing as indicated in the paragraph “2.6 Removing the casing”.
-
Disconnect the connecting cables of the electrodes.
-
Disconnect the power cables of the fan.
-
Take out the clip (
A
) of the mixer.
-
Loosen the nut of the gas train (
B
).
-
Take out and turn the gas train.
-
Remove the 4 nuts (
C
) that fix the combustion uni.t
-
Take out the air/gas conveyor assembly including the fan and mixer, being careful not to
damage the insulating panel and the electrodes.
A
B
C
Primary heat exchanger
-
Remove the siphon connecting pipe from the condensate drain fitting of the heat
exchanger and connect a temporary collecting pipe. At this point proceed with the heat
exchanger cleaning operations.
-
Vacuum out any dirt residues inside the heat exchanger, being careful NOT to damage
the retarder insulating panel.
-
Clean the coils of the heat exchanger with a soft bristled brush.
b
DO NOT USE METAL BRUSHES THAT COULD DAMAGE THE COMPONENTS.
-
Clean the spaces between the coils using 0.4 mm thick blade, also available in a kit.
-
Vacuum away any residues produced by the cleaning.
-
Rinse with water, being careful NOT to damage the retarder insulating panel.
-
Make sure the retarder insulation panel is undamaged and replace it if necessary
following the relative procedure.
-
Once the cleaning operations are finished, carefully reassemble all the components,
following the above instructions in the reverse order.
Содержание 20187642
Страница 1: ...Family KIS EN INSTALLER AND USER MANUAL...
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ...Cod 20187595 09 21 Ed 3...