GENERAL
October 7, 2016
9120
Assembly
8 - 3
This section describes the proper procedures for assembly and repacking of all Cruiser and Commander
life rafts.
Before beginning the assembly, the work area must be clean, dry, and free from sharp projections.
Work should be done on a smooth surface, preferably linoleum.
Throughout preparation and packing of the liferaft and its associated equipment, all ties are to be
bowlines unless stated otherwise, and are to be taped over with 1in. (25mm) white adhesive tape. The
ends of nylon cords are to be heat-sealed to prevent fraying and secured with white adhesive tape.
When gathering cordage it is important to fake fold (accordion style) the line instead of looping it.
(See Fig. 1) This will allow the line to unravel cleanly and prevent tangles in the line.
Warning: A fully charged cylinder can become a lethal projectile if discharged to
atmosphere when not fitted with a diffuser cap. Always fit the diffuser caps to
the cylinder valve outlets when handling a fully charged cylinder.
See Chapter 10 Tools, Fixtures, and Equipment for detailed descriptions of any tools used in the
assembly/packing procedure.
FIGURE 1 – FAKE (ACCORDIAN) FOLD/LOOP FOLD
Содержание Coastal Commander 2.0
Страница 2: ......
Страница 4: ...October 7 2016 RR 2 Record of Revisions 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ......
Страница 8: ...October 7 2016 SB 2 Service Bulletin 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 12: ...October 7 2016 EP 4 9120 PAGE No ISSUE DATE PAGE TITLE PAGE No ISSUE DATE...
Страница 13: ...LIST OF ASSOCIATED PUBLICATIONS October 7 2016 9120 Associated Publications AP 1 None Listed...
Страница 14: ...October 7 2016 AP 2 Associated Publications 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 16: ...October 7 2016 AB 2 List of Abbreviations 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 18: ...October 7 2016 TC 2 Table of Contents 9120 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Страница 20: ...October 7 2016 1 2 Introduction 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...October 7 2016 2 2 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 28: ...October 7 2016 2 6 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...October 7 2016 2 16 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...FIGURE 6 DEPLOYMENT October 7 2016 2 18 Description 9120...
Страница 41: ...CHAPTER 3 DISASSEMBLY October 7 2016 9120 Disassembly 3 1 General 3 Procedures 5...
Страница 42: ...October 7 2016 3 2 Disassembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...October 7 2016 3 4 Disassembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 48: ...October 7 2016 3 8 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...October 7 2016 4 2 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 52: ...October 7 2016 4 4 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...May 24 2018 4 6 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 56: ...October 7 2016 4 8 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 61: ...May 24 2018 9120 Testing 4 13 FIGURE 1 DIGITAL MANOMETER...
Страница 66: ...October 7 2016 4 18 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 68: ...October 7 2016 5 2 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 70: ...October 7 2016 5 4 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 72: ...October 7 2016 5 6 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 74: ...October 7 2016 6 2 Inspection 9120...
Страница 75: ...GENERAL October 7 2016 9120 Inspection 6 3 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 77: ...GENERAL October 7 2016 9120 Inspection 6 5 THIS PAGE INITIALLY LEFT BLANK...
Страница 79: ...GAS INFLATION SYSTEM October 7 2016 9120 Inspection 6 7 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 81: ...SURVIVAL EQUIPMENT PACKS October 7 2016 9120 Inspection 6 9 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...October 7 2016 7 2 Repair 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 86: ...October 7 2016 7 4 Repair 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 94: ...FIGURE 1 PATCHES AND TAPE APPLICATION October 7 2016 7 12 Repair 9120...
Страница 95: ...FIGURE 2 PATCH APPLICATION OVER SEAM October 7 2016 9120 Repair 7 13...
Страница 98: ...October 7 2016 8 2 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...October 7 2016 8 4 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 110: ...October 7 2016 8 14 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 125: ...October 7 2016 9120 Assembly 8 29 FIGURE 28 POSITIONING HEAT SHRINK SLEEVE FIGURE 29 CONTAINER STRAPS...
Страница 128: ...October 7 2016 8 32 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 129: ...CHAPTER 9 STORAGE October 7 2016 9120 Storage 9 1 General 3 s...
Страница 130: ...October 7 2016 9 2 Storage 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 132: ...October 7 2016 9 4 Storage 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 133: ...CHAPTER 10 TOOL EQUIPMENT AND MATERIALS October 7 2016 9120 Tools 10 1 General 3 Tool List 5...
Страница 134: ...October 7 2016 10 2 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 136: ...October 7 2016 10 4 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 140: ...October 7 2016 10 8 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 144: ...October 7 2016 10 12 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 145: ...CHAPTER 11 SPARE PARTS LIST October 7 2016 9120 Spare Parts 11 1 Introduction 3 Image List 5...
Страница 146: ...October 7 2016 11 2 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 148: ...October 7 2016 11 4 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 166: ...May 24 2018 11 22 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...October 7 2016 9120 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ......