October 7, 2016
3 - 6
Disassembly
9120
FIGURE 1 – CUTTING CONTAINER STRAPS
Valise
Carefully pull open the Velcro fasteners on the valise. Remove the looped painterline from around
the painterline patch on the valise.
For Cruiser rafts, carefully untie the painterline and pass the end of the painterline back through
the inflation valve pull cable loop.
For Commander rafts, untie the painterline from the outside loop patch on the vacuum bag and
carefully untie the painterline from vacuum clip. After everything has been disconnected and
place it to the side.
Warning: Although the painterline is now disconnected from the inflation system,
the inflation system is still charged and armed. Maintain caution while
handling any part of the inflation system, with special attention to the
inflation valve pull cable.
3.
Carefully lift the liferaft out of the valise/container, lay it on a prepared working area.
For Commander rafts, disconnect vacuum clip from around inflation cable ball, making sure not to
pull on the inflation valve toggle pull cable in the process. DO NOT REUSE VACUUM PACK
DURING REPACK.
Содержание Coastal Commander 2.0
Страница 2: ......
Страница 4: ...October 7 2016 RR 2 Record of Revisions 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ......
Страница 8: ...October 7 2016 SB 2 Service Bulletin 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 12: ...October 7 2016 EP 4 9120 PAGE No ISSUE DATE PAGE TITLE PAGE No ISSUE DATE...
Страница 13: ...LIST OF ASSOCIATED PUBLICATIONS October 7 2016 9120 Associated Publications AP 1 None Listed...
Страница 14: ...October 7 2016 AP 2 Associated Publications 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 16: ...October 7 2016 AB 2 List of Abbreviations 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 18: ...October 7 2016 TC 2 Table of Contents 9120 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Страница 20: ...October 7 2016 1 2 Introduction 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...October 7 2016 2 2 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 28: ...October 7 2016 2 6 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...October 7 2016 2 16 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...FIGURE 6 DEPLOYMENT October 7 2016 2 18 Description 9120...
Страница 41: ...CHAPTER 3 DISASSEMBLY October 7 2016 9120 Disassembly 3 1 General 3 Procedures 5...
Страница 42: ...October 7 2016 3 2 Disassembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...October 7 2016 3 4 Disassembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 48: ...October 7 2016 3 8 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...October 7 2016 4 2 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 52: ...October 7 2016 4 4 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...May 24 2018 4 6 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 56: ...October 7 2016 4 8 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 61: ...May 24 2018 9120 Testing 4 13 FIGURE 1 DIGITAL MANOMETER...
Страница 66: ...October 7 2016 4 18 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 68: ...October 7 2016 5 2 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 70: ...October 7 2016 5 4 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 72: ...October 7 2016 5 6 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 74: ...October 7 2016 6 2 Inspection 9120...
Страница 75: ...GENERAL October 7 2016 9120 Inspection 6 3 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 77: ...GENERAL October 7 2016 9120 Inspection 6 5 THIS PAGE INITIALLY LEFT BLANK...
Страница 79: ...GAS INFLATION SYSTEM October 7 2016 9120 Inspection 6 7 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 81: ...SURVIVAL EQUIPMENT PACKS October 7 2016 9120 Inspection 6 9 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...October 7 2016 7 2 Repair 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 86: ...October 7 2016 7 4 Repair 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 94: ...FIGURE 1 PATCHES AND TAPE APPLICATION October 7 2016 7 12 Repair 9120...
Страница 95: ...FIGURE 2 PATCH APPLICATION OVER SEAM October 7 2016 9120 Repair 7 13...
Страница 98: ...October 7 2016 8 2 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...October 7 2016 8 4 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 110: ...October 7 2016 8 14 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 125: ...October 7 2016 9120 Assembly 8 29 FIGURE 28 POSITIONING HEAT SHRINK SLEEVE FIGURE 29 CONTAINER STRAPS...
Страница 128: ...October 7 2016 8 32 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 129: ...CHAPTER 9 STORAGE October 7 2016 9120 Storage 9 1 General 3 s...
Страница 130: ...October 7 2016 9 2 Storage 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 132: ...October 7 2016 9 4 Storage 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 133: ...CHAPTER 10 TOOL EQUIPMENT AND MATERIALS October 7 2016 9120 Tools 10 1 General 3 Tool List 5...
Страница 134: ...October 7 2016 10 2 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 136: ...October 7 2016 10 4 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 140: ...October 7 2016 10 8 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 144: ...October 7 2016 10 12 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 145: ...CHAPTER 11 SPARE PARTS LIST October 7 2016 9120 Spare Parts 11 1 Introduction 3 Image List 5...
Страница 146: ...October 7 2016 11 2 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 148: ...October 7 2016 11 4 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 166: ...May 24 2018 11 22 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...October 7 2016 9120 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ......