October 7, 2016
8 - 26
Assembly
9120
FIGURE 24 – CLOSE VELCRO PATCH
26.
After making sure all vacuum bag corners are contained within the valise, shut the valise by
mating all velcro strips together.
27.
Place completed inspection sticker on valise.
Packing into Container
28.
Locate the bottom container shell and place it on the floor of the working area. Place the
Container Plug in the hole in the bottom container.
29.
Place the raft (vacuum packed for Commanders, not vacuum packed for Cruisers) into container
with cylinder inflation valve oriented toward the hole in the side of the container.
30.
Place painterline sachet assembly lengthwise on top of the vacuum sealed raft with the cord
facing the inflation valve. Tape down with black gaffers tape.
31.
For Coastal Cruisers, see Step 17 for attachment of inflation valve to painterline.
32.
For Commanders, see Steps 18-19 for attachment of inflation valve to painterline. (Also, see
Figure 25).
Содержание Coastal Commander 2.0
Страница 2: ......
Страница 4: ...October 7 2016 RR 2 Record of Revisions 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ......
Страница 8: ...October 7 2016 SB 2 Service Bulletin 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 12: ...October 7 2016 EP 4 9120 PAGE No ISSUE DATE PAGE TITLE PAGE No ISSUE DATE...
Страница 13: ...LIST OF ASSOCIATED PUBLICATIONS October 7 2016 9120 Associated Publications AP 1 None Listed...
Страница 14: ...October 7 2016 AP 2 Associated Publications 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 16: ...October 7 2016 AB 2 List of Abbreviations 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 18: ...October 7 2016 TC 2 Table of Contents 9120 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Страница 20: ...October 7 2016 1 2 Introduction 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...October 7 2016 2 2 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 28: ...October 7 2016 2 6 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...October 7 2016 2 16 Description 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...FIGURE 6 DEPLOYMENT October 7 2016 2 18 Description 9120...
Страница 41: ...CHAPTER 3 DISASSEMBLY October 7 2016 9120 Disassembly 3 1 General 3 Procedures 5...
Страница 42: ...October 7 2016 3 2 Disassembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...October 7 2016 3 4 Disassembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 48: ...October 7 2016 3 8 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...October 7 2016 4 2 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 52: ...October 7 2016 4 4 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...May 24 2018 4 6 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 56: ...October 7 2016 4 8 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 61: ...May 24 2018 9120 Testing 4 13 FIGURE 1 DIGITAL MANOMETER...
Страница 66: ...October 7 2016 4 18 Testing 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 68: ...October 7 2016 5 2 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 70: ...October 7 2016 5 4 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 72: ...October 7 2016 5 6 Cleaning 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 74: ...October 7 2016 6 2 Inspection 9120...
Страница 75: ...GENERAL October 7 2016 9120 Inspection 6 3 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 77: ...GENERAL October 7 2016 9120 Inspection 6 5 THIS PAGE INITIALLY LEFT BLANK...
Страница 79: ...GAS INFLATION SYSTEM October 7 2016 9120 Inspection 6 7 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 81: ...SURVIVAL EQUIPMENT PACKS October 7 2016 9120 Inspection 6 9 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...October 7 2016 7 2 Repair 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 86: ...October 7 2016 7 4 Repair 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 94: ...FIGURE 1 PATCHES AND TAPE APPLICATION October 7 2016 7 12 Repair 9120...
Страница 95: ...FIGURE 2 PATCH APPLICATION OVER SEAM October 7 2016 9120 Repair 7 13...
Страница 98: ...October 7 2016 8 2 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...October 7 2016 8 4 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 110: ...October 7 2016 8 14 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 125: ...October 7 2016 9120 Assembly 8 29 FIGURE 28 POSITIONING HEAT SHRINK SLEEVE FIGURE 29 CONTAINER STRAPS...
Страница 128: ...October 7 2016 8 32 Assembly 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 129: ...CHAPTER 9 STORAGE October 7 2016 9120 Storage 9 1 General 3 s...
Страница 130: ...October 7 2016 9 2 Storage 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 132: ...October 7 2016 9 4 Storage 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 133: ...CHAPTER 10 TOOL EQUIPMENT AND MATERIALS October 7 2016 9120 Tools 10 1 General 3 Tool List 5...
Страница 134: ...October 7 2016 10 2 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 136: ...October 7 2016 10 4 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 140: ...October 7 2016 10 8 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 144: ...October 7 2016 10 12 Tools 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 145: ...CHAPTER 11 SPARE PARTS LIST October 7 2016 9120 Spare Parts 11 1 Introduction 3 Image List 5...
Страница 146: ...October 7 2016 11 2 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 148: ...October 7 2016 11 4 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 166: ...May 24 2018 11 22 Spare Parts 9120 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...October 7 2016 9120 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ......