Standard 30 MF
110-700
Operator and Service Manual
Edition: 8
2-5
4361.DOC010302 AUG18.DOCX
The following installation situations are possible:
Floor mounting and pointing to the bow
Floor mounting and pointing to starboard
Floor mounting and pointing to the stern
Floor mounting and pointing to port
Ceiling mounting and pointing to the bow
Ceiling mounting and pointing to starboard
Ceiling mounting and pointing to the stern
Ceiling mounting and pointing to port
2.3.1
Required Installation Material
The following material is needed to install the Standard 30 MF:
4 cylinder head bolts M6 x 16 or 4 hex-nuts M6 with suitable washers
Attachment material for ground connection on the vessel side (depending on the
design of the ground connection on the vessel side)
Cable ties and / or cable clamps for cable routing (depending on the environment
conditions at the installation position)
2.3.2
Installation Material for System Applications
Required installation material for additional devices (DU, Operator Unit etc.): see the
respective manual.
Содержание Standard 30 MF
Страница 104: ...Standard 30 MF 110 700 Operator and Service Manual 4361 DOC010302 AUG18 DOCX 4 8 Edition 8 Intentionally left blank ...
Страница 106: ...Standard 30 MF 110 700 Operator and Service Manual 4361 DOC010302 AUG18 DOCX 5 2 Edition 8 Intentionally left blank ...
Страница 108: ...Standard 30 MF 110 700 Operator and Service Manual 4361 DOC010302 AUG18 DOCX 6 2 Edition 8 Intentionally left blank ...