2.3.8
Setting to Work and Commissioning the Standard 30 MF
Figure 2-3
Setting to work, Schematic Example
Pos.
Description
1
Installation room on the vessel
2
Final installation position and orientation and first initialization position
3
Second initialization position (turned 180° compared to the final position)
Notes on the schematic view of the installation:
In the example (Figure 2-3), the compass is mounted on the floor with the front side
(plug side) facing the stern.
CAUTION
Risk of malfunction due to incomplete initialization
An interruption of the power supply during the setting to work
procedure will trigger an undefined state of the Standard 30 MF.
► If the power supply is interrupted during the installation
procedure, the entire procedure must be restarted.
1. Determine the final installation position and the final installation orientation of the
Standard 30 MF within a maximum of +/- 6°to roll or pitch axis.
1
2
3
180°
Содержание Standard 30 MF
Страница 104: ...Standard 30 MF 110 700 Operator and Service Manual 4361 DOC010302 AUG18 DOCX 4 8 Edition 8 Intentionally left blank ...
Страница 106: ...Standard 30 MF 110 700 Operator and Service Manual 4361 DOC010302 AUG18 DOCX 5 2 Edition 8 Intentionally left blank ...
Страница 108: ...Standard 30 MF 110 700 Operator and Service Manual 4361 DOC010302 AUG18 DOCX 6 2 Edition 8 Intentionally left blank ...