7500-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
22 of 143
SECTION 7: AIR TURNOVER UNIT ASSEMBLY
The air t
u
rno
v
er
u
nit is shipped in m
u
ltiple sections
that req
u
ire field assem
b
ly. The
b
ase section m
u
st
first
b
e fastened to the concrete sla
b
or floor
b
efore
the remaining sections are mo
u
nted.
To attach the
b
ase section to a concrete sla
b
, it m
u
st
b
e sec
u
red
w
ith the
u
se of st
u
ds em
b
edded in the
concrete. St
u
ds (pro
v
ided
b
y others) m
u
st
b
e
installed in the sla
b
, one for each 3/4"(19.1 cm) hole
drilled thro
u
gh the flanges located on the
b
ottom of
the
b
ase section.
. Fasten the
b
ase section to the sla
b
w
ith fo
u
r hex n
u
ts and lock
w
ashers (pro
v
ided
b
y others).
Lift the remaining sections, as applica
b
le, into place.
. To assem
b
le,
u
se the
s
u
pplied hard
w
are and
b
olt the sections together
thro
u
gh the pre-drilled holes. S
u
pplied hard
w
are
m
u
st
b
e torq
u
ed to recommended specifications
. For details,
.
Beca
u
se of the height of the air t
u
rno
v
er
u
nit, it is
highly recommended to sec
u
re the top of the air
t
u
rno
v
er
u
nit to the str
u
ct
u
re's ceiling s
u
pport
b
eams
for sta
b
ility. This is mandatory
w
hene
v
er the optional
discharge extensions are
u
sed.
Crush Hazard
Use proper lifting
equipment and
practices.
Falling Hazard
Use proper safety
equipment and prac-
tices to avoid falling.
Severe Injury Hazard
Use proper lifting
practices and equip-
ment.
Equipment and
accessories are
heavy.
Cut/Pinch Hazard
Wear protective gear
during installation,
operation and
service.
Edges are sharp.
WARNING
Failure to follow these instructions can result in death, injury or property damage.
Содержание 7500 136
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 33: ...SECTION 6 LIFTING AN AIR TURNOVER UNIT 21 of 143 FIGURE 10 Lifting an Air Turnover Unit Base Section...
Страница 36: ...7500 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 24 of 143 FIGURE 12 Air Turnover Unit Sections Schematic...
Страница 67: ...SECTION14 ELECTRICAL 55 of 143 FIGURE 38 Wiring Diagram Key...
Страница 115: ...SECTION 15 SEQUENCE OF OPERATION 103 of 143 FIGURE 83 Wiring Subbase and Sequence Chart for RM7897 Burner Control Module...
Страница 156: ......