7500-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
6 of 143
SECTION 2: INSTALLER RESPONSIBILITY
The installer is responsi
b
le for the follo
w
ing:
• To install and commission the air t
u
rno
v
er
u
nit, as
w
ell as the f
u
el and electrical s
u
pplies, in
accordance
w
ith applica
b
le specifications and
codes. Rapid Engineering LLC recommends the
installer contact a local
bu
ilding inspector or Fire
Marshal for g
u
idance.
• To
u
se the information gi
v
en in a layo
u
t dra
w
ing
and in the man
u
al together
w
ith the cited codes
and reg
u
lations to perform the installation.
• To f
u
rnish all needed materials not f
u
rnished as
standard eq
u
ipment.
• To plan location of s
u
pports.
• To pro
v
ide access to air t
u
rno
v
er
u
nit for
ser
v
icing.
• To pro
v
ide the o
w
ner
w
ith a copy of this
Installation, Operation and Ser
v
ice Man
u
al.
• To ens
u
re there is adeq
u
ate air circ
u
lation aro
u
nd
the air t
u
rno
v
er
u
nit and to s
u
pply air for
com
bu
stion,
v
entilation and distri
bu
tion in
accordance
w
ith local codes. The
bu
rners
u
sed
on the air t
u
rno
v
er
u
nits req
u
ire press
u
re-ne
u
tral
air for proper com
bu
stion and performance. A
bu
rner's com
bu
stion air sho
u
ld not
b
e attempted
to
b
e p
u
lled from a negati
v
e air press
u
re
en
v
ironment. To a
v
oid creating a negati
v
e
press
u
re en
v
ironment in a
w
ell-sealed space,
there sho
u
ld
b
e a fresh air penetration in the
w
all
or roof of the space of a minim
u
m size eq
u
i
v
alent
to 0.5 sq in (3.2 sq cm) per 1,000 Bt
u
/h (293.1
kW) inp
u
t capacity of eq
u
ipment in the space. For
information on p
u
lling com
bu
stion air from o
u
tside
of the air t
u
rno
v
er
u
nit's immediate
v
• To assem
b
le or install any accessories or
associated d
u
ct
w
ork
u
sing
b
est
bu
ilding
practices.
• To properly size s
u
pports and hanging materials.
WARNING
Explosion Hazard
Equipment must have access to
uncontaminated air at all times.
Failure to follow these instructions can result
in death, injury or property damage.
Содержание 7500 136
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 33: ...SECTION 6 LIFTING AN AIR TURNOVER UNIT 21 of 143 FIGURE 10 Lifting an Air Turnover Unit Base Section...
Страница 36: ...7500 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 24 of 143 FIGURE 12 Air Turnover Unit Sections Schematic...
Страница 67: ...SECTION14 ELECTRICAL 55 of 143 FIGURE 38 Wiring Diagram Key...
Страница 115: ...SECTION 15 SEQUENCE OF OPERATION 103 of 143 FIGURE 83 Wiring Subbase and Sequence Chart for RM7897 Burner Control Module...
Страница 156: ......