SECTION 16: S
TART
-
UP
P
ROCEDURES
107 of 143
Installation Code and Annual Inspections:
All installation and ser
v
ice of RAPID
®
eq
u
ipment
m
u
st
b
e performed
b
y a contractor q
u
alified in the
installation and ser
v
ice of eq
u
ipment sold and
s
u
pplied
b
y Rapid Engineering LLC and conform to
all req
u
irements set forth in the RAPID
®
man
u
als and
all applica
b
le go
v
ernmental a
u
thorities pertaining to
the installation, ser
v
ice operation and la
b
eling of the
eq
u
ipment.
To help facilitate optim
u
m performance and safety,
Rapid Engineering LLC recommends that a q
u
alified
contractor cond
u
ct, at a minim
u
m, ann
u
al
inspections of yo
u
r RAPID
®
eq
u
ipment and perform
ser
v
ice
w
here necessary,
u
sing only replacement
parts sold and s
u
pplied
b
y Rapid Engineering LLC.
Check installation site to ens
u
re all codes and
engineering specifications are correct. This section of
the man
u
al is intended to
b
e
u
sed as an instr
u
ctional
g
u
ide to the commissioning of the indirect fired air
t
u
rno
v
er
u
nit. Fill o
u
t the attached start
u
p sheet
(located at the
b
ack of the man
u
al) as each step of
the proced
u
re is performed. This proced
u
re sho
u
ld
b
e completed
b
y the commissioning contractor and
ret
u
rned to Rapid Engineering LLC.
16.1 Mechanical
16.1.1 Sheave Ali
g
nment
Shea
v
es are factory aligned. On all air t
u
rno
v
er
u
nits,
check shea
v
e alignment as follo
w
s.
1. Attach a string to the
v
ertical s
u
rface next to
the
b
lo
w
er shaft
b
earing. (
2.
Wrap the string aro
u
nd the fan shea
v
e and
across
b
oth shea
v
e s
u
rfaces as sho
w
n.
3.
Adj
u
st
u
ntil all fo
u
r contact points (triangle)
to
u
ch the shea
v
e s
u
rfaces. "IN" or "OUT"
adj
u
stment of the motor shea
v
e and/or motor
adj
u
stment may
b
e req
u
ired.
4.
P
u
ll the string a
w
ay from the motor shea
v
e and
then mo
v
e it slo
w
ly
b
ack to
w
ards the shea
v
e,
making s
u
re the string remains straight
w
hile
to
u
ching all contact points.
5.
Remo
v
e string
b
efore t
u
rning air t
u
rno
v
er
u
nit
on.
NOTE: Allo
w
ances m
u
st
b
e made for motor shea
v
es
w
hich are
w
ider than the
b
lo
w
er shea
v
es.
FIGURE
8
5: Sheave Ali
g
nment
16.1.2 Belt Tension
• Belt tension sho
u
ld
b
e checked
w
ith a
b
elt-tension
ga
u
ge
w
hen one is a
v
aila
b
le. Follo
w
the
b
elt
tension ga
u
ge instr
u
ctions.
• When a tension ga
u
ge is not a
v
aila
b
le, meas
u
re
the
b
elt span of the
b
elts.
• Allo
w
for 1/64" (.04 cm) of deflection for each inch
of center distance length for the charted po
u
nds
of force. Check the ta
b
le
b
elo
w
for proper
deflection force.
• EXAMPLE: A 40" (101.6 cm) shaft center
distance
w
o
u
ld dictate 40"/64" or 5/8" (1.59
cm) of deflection. With a standard B-type
V-
b
elt and a motor shea
v
e meas
u
ring
b
et
w
een 5.8" (1.59 cm) and 8.6" (21.84 cm),
the
b
elt
w
ill ha
v
e proper tension if a 5/8"
deflection can
b
e achie
v
ed
w
ith a minim
u
m of
6-3/8 inch l
b
s. and a maxim
u
m of 8-3/4 inch
l
b
s. of press
u
re as meas
u
red
w
ith a
b
elt
tensioning ga
u
ge.
Correct Alignment
Incorrect Alignment
Содержание 7500 136
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 33: ...SECTION 6 LIFTING AN AIR TURNOVER UNIT 21 of 143 FIGURE 10 Lifting an Air Turnover Unit Base Section...
Страница 36: ...7500 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 24 of 143 FIGURE 12 Air Turnover Unit Sections Schematic...
Страница 67: ...SECTION14 ELECTRICAL 55 of 143 FIGURE 38 Wiring Diagram Key...
Страница 115: ...SECTION 15 SEQUENCE OF OPERATION 103 of 143 FIGURE 83 Wiring Subbase and Sequence Chart for RM7897 Burner Control Module...
Страница 156: ......