17.1 General
17.2 Unit Exterior
17.3 Fan Section
First
8
Hours of Operation
Check
b
elts and adj
u
st as req
u
ired (
). Tho
u
gh
b
elts
w
ere properly adj
u
sted at the factory, they
w
ill stretch after the first fe
w
ho
u
rs of operation.
First 100 Hours of
Operation
Re-check
b
elt tension and adj
u
st if necessary.
Annual Fall Start-Up
Follo
w
the entire start-
u
p proced
u
re at this time and check control settings
and operation.
Cabinet Exterior
After installation, to
u
ch
u
p scratches. Periodic painting sho
u
ld
b
e done there-
after as req
u
ired.
Unit Location
Verify that no flamma
b
le o
b
jects, liq
u
ids or
v
apors are present near the air
t
u
rno
v
er
u
nit. Minim
u
m clearances to com
bu
sti
b
les aro
u
nd the
v
ent pipe are
significantly higher than for the air t
u
rno
v
er
u
nit.
.
Do not hang anything from or place anything on the air t
u
rno
v
er
u
nit.
Keep the area
u
nder and aro
u
nd the air t
u
rno
v
er
u
nit free of all o
b
jects.
Heat Exchan
g
er
Inspection/Relief Cap
This cap m
u
st remain closed at all times. It is opened
w
hen the heat
exchanger experiences extreme internal press
u
re. E
v
ery six months check for
tightness of retaining collar, freeness of hinge mo
v
ement and hinge spring
strength/condition. Replace if cap is not sec
u
rely held closed.
Vent Pipe and Terminals
Look for dirt, o
b
str
u
ctions, cracks on the pipe, gaps in the sealed areas and
corrosion. Clean or replace as req
u
ired. Do not
u
se the air t
u
rno
v
er
u
nit if
there is dirt, sagging, cracking or distortion. Remo
v
e any car
b
on deposits or
scale
u
sing a
w
ire
b
r
u
sh. If applica
b
le, check ins
u
lation of
v
ent pipe. Repair
as req
u
ired. Ins
u
lation m
u
st ha
v
e a minim
u
m temperat
u
re rating of 1000° F
(537.8° C).
Propeller
Inspect propeller and clean as necessary. A small
bu
ild
u
p of d
u
st can ca
u
se
a significant decrease in fan performance. Check for excessi
v
e
v
i
b
ration,
repair as req
u
ired.
Drive Belts and Sheaves
Check for
b
elt ride in the groo
v
e. In m
u
ltiple groo
v
e dri
v
es,
b
elt ride sho
u
ld
b
e
u
niform. Check groo
v
e
w
ear area for
w
ear. Side
w
all of groo
v
e sho
u
ld
b
e
straight, not dished o
u
t. Bottom of groo
v
e sho
u
ld sho
w
no signs of
b
elt con-
tact.
Shea
v
e alignment, set scre
w
torq
u
e and
b
elt tension sho
u
ld
b
e checked after
8, 24, and 100 ho
u
rs of initial start-
u
p. Vis
u
ally inspect
b
elts and shea
v
es for
excessi
v
e
w
ear. If
b
elts ha
v
e a slick, glazed look, the
b
elts are slipping. Check
dri
v
e capacity and
b
elt tension. Ne
v
er replace only one
b
elt in a
u
sed set, as
u
sed
b
elts
w
ill elongate. Replace the entire set if replacement is necessary.
Fan Bearin
g
Lubrication
The fan
b
earings sho
u
ld
b
e re-l
ub
ricated e
v
ery 3,000 ho
u
rs of operation or 6
months,
w
hiche
v
er occ
u
rs first. The recommended l
ub
ricant is Shell Al
v
ania
#2 or S3 grease. To re-l
ub
ricate the
b
lo
w
er pillo
w
b
lock/flange
b
earings,
b
e
s
u
re that the grease fittings on the
b
earing ho
u
sing (or air t
u
rno
v
er
u
nit ca
b
i-
net
w
all in the case of extended grease lines) are clean. Apply the recom-
mended amo
u
nt of grease (per the
b
earing man
u
fact
u
rer) to the fitting
w
ith a
lo
w
-press
u
re grease g
u
n and add slo
w
ly
w
hile the shaft is sp
u
n
b
y hand. Do
not o
v
er-grease. O
v
er-greasing
w
ill red
u
ce the ser
v
ice life of the
b
earings.
Содержание 7500 136
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 33: ...SECTION 6 LIFTING AN AIR TURNOVER UNIT 21 of 143 FIGURE 10 Lifting an Air Turnover Unit Base Section...
Страница 36: ...7500 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 24 of 143 FIGURE 12 Air Turnover Unit Sections Schematic...
Страница 67: ...SECTION14 ELECTRICAL 55 of 143 FIGURE 38 Wiring Diagram Key...
Страница 115: ...SECTION 15 SEQUENCE OF OPERATION 103 of 143 FIGURE 83 Wiring Subbase and Sequence Chart for RM7897 Burner Control Module...
Страница 156: ......