![Rapid 7500 136 Скачать руководство пользователя страница 140](http://html1.mh-extra.com/html/rapid/7500-136/7500-136_installation-operation-and-service-manual_3682752140.webp)
7500-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
128 of 143
The follo
w
ing is di
v
ided into t
w
o
b
asic categories -
fan pro
b
lems and
bu
rner pro
b
lems. In some cases,
they interrelate. In order to
u
se this effecti
v
ely, yo
u
sho
u
ld familiarize yo
u
rself
w
ith
b
oth categories.
19.1 Initial Checks
When enco
u
ntering any a
b
normal operation or fa
u
lt
conditions of the eq
u
ipment, all tro
ub
leshooting
sho
u
ld start
w
ith the follo
w
ing initial checks. If a
pro
b
lem is disco
v
ered in these initial checks, it m
u
st
b
e corrected
b
efore mo
v
ing on in the tro
ub
le
shooting.
1. Compare
v
oltage and phase of s
u
pply po
w
er
on site
w
ith rating plate information.
2.
Re
v
ie
w
w
iring
b
et
w
een remote panel and
control panel. Do the electrical connections
match the s
u
pplied
w
iring diagram?
3.
Compare gas type and s
u
pply press
u
re on site
w
ith rating plate information.
4.
Check for proper fan rotation on air
t
u
rno
v
er
u
nit.
• Fans po
w
ered
w
ith a three phase motor can
b
e re
v
ersed
b
y s
w
apping any t
w
o incoming
po
w
er legs to the motor starter.
For fans po
w
ered
b
y a single phase motor,
refer to the motor rating plate for re
v
ersing
instr
u
ctions.
Содержание 7500 136
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 33: ...SECTION 6 LIFTING AN AIR TURNOVER UNIT 21 of 143 FIGURE 10 Lifting an Air Turnover Unit Base Section...
Страница 36: ...7500 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 24 of 143 FIGURE 12 Air Turnover Unit Sections Schematic...
Страница 67: ...SECTION14 ELECTRICAL 55 of 143 FIGURE 38 Wiring Diagram Key...
Страница 115: ...SECTION 15 SEQUENCE OF OPERATION 103 of 143 FIGURE 83 Wiring Subbase and Sequence Chart for RM7897 Burner Control Module...
Страница 156: ......