A
Safety information
63
Grounding requirements
Electrical grounding of the equipment is required for operator safety and correct equipment
operation. Proper grounding of the electrical outlet can be verified by a certified electrician.
Power cord notice
For units intended to be operated in DC (-48V to -60V): Use a UL listed and CSA-certified cord
set consisting of a minimum 12 AWG two-conductor cord that is a maximum of 15 feet in
length.
For units intended to be operated at 115 volts: Use a UL-listed and CSA-certified cord set
consisting of a minimum 16 AWG type SVT or SJT three-conductor cord that is a maximum of
15 feet in length, with a parallel blade grounding-type attachment plug rated 13 amperes, 125
volts.
For units intended to be operated at 230 volts (U.S. use): Use a UL-listed and CSA-certified
cord set consisting of a minimum 16 AWG type SVT or SJT three-conductor cord that is a
maximum of 15 feet in length, with a tandem blade grounding-type attachment plug rated 13
amperes, 250 volts.
For units intended to be operated at 230 volts (outside the U.S.): Use a cord set with a
grounding-type attachment plug. The cord set should be marked <HAR> and have the
appropriate safety approvals for the country in which the equipment will be installed.
Internal options
Before removing any internal option, power-off the equipment, unplug all power cords from
electrical outlets, remove the battery pack, and then disconnect any interconnecting cables.
Batteries
W
ARNING
!
The lithium battery presents a fire, explosion, or severe burn risk. Do not recharge it,
remove its polarized connector, disassemble it, heat it above 100°C (212°F), incinerate it, or expose
its cell contents to water. Dispose of the battery as required by local ordinances or regulations.
Always replace the battery with one of the same or equivalent type recommended by the
manufacturer. Replacement batteries can be ordered from your service representative.
Содержание R220
Страница 1: ...R220 NETWORK APPLIANCE July 2014 Setup Guide ...
Страница 32: ...3 Installing optional components 32 Figure 18 Installing removing the I O module ...
Страница 34: ...3 Installing optional components 34 Figure 20 Inserting the drive carrier into the drive cage ...
Страница 42: ...3 Installing optional components 42 Figure 27 Installing the rail kits into a threaded hole EIA 4 post rack ...
Страница 45: ...3 Installing optional components 45 Figure 29 Installing the rail kits into a Telecom 2 post rack ...