45
4. Place the wash bottle back in the instrument and close the door.
Once the pop-up is closed, the instrument will once more flush and soak, while also
back-priming the DI water in the system; the task is reflected on screen, as shown in
Figure 44.
When finished, the screen that is shown in Figure 40 will re-appear. From here,
the user may return to the
main menu
, or if so inclined, re-run the cleaning.
9 QC test using RIDA qLine® Soft
Place 10 strips of the RIDA qLine® QC-Kit (ZG1108) in positions 1 to 10 of the RIDA qLine®
autoBlot strip holder. The autoBlot analyzer must be switched on.
Next start the RIDA qLine® Soft program, and run RLink_AutoBlot.exe.
Open the RLink_AutoBlot program,
and click QC test.
Figure 44:
The screen that is shown while
Figure 43:
The pop-up asking the user
to load the DI water