Section III - Installation
12
Quincy Compressor-QSI
®
• Receiving
• Moving the Unit to the Installation Site
• Location
• Piping Connections
• Relief Valves
• Electrical
• Guards
• Manual Vent and Shutoff Valves
• Water and Sewer Facilities at the Installation
Site (Water-cooled models only)
• Compressor Rotation
• Fan Rotation
Receiving
Upon receipt, immediately inspect the compressor for any
visible damage that may have occurred during shipment.
If visible damage is found, the delivering carrier should
make a notation on the freight bill and the customer
should request a damage report. If the shipment is ac
-
cepted and damage is found later, it is classified as con
-
cealed damage. Concealed damage should be reported
to the delivering carrier within 15 days of delivery. The
delivering carrier must prepare a damage report. Item
-
ized supporting papers are essential to filing a claim.
Read the compressor nameplate to be sure the compressor
is the model and size ordered and that optionally ordered
items are included.
Check the reservoir and pressure relief valves to be sure
they are adequate for the pressure at which you intend to
operate.
Moving the Unit to the Installation Site
Forklift slots are provided in one side and one end of the
main frame. Use of chains and slings should be limited
to the main frame. Do not attempt to lift the unit by
attaching to any components. Optional lifting eyes are
available.
CAUTION!
Improper lifting may result in component, system
damage or personal injury. Follow good shop
practices and safety procedures when moving
the unit.
Содержание QSI Series
Страница 2: ......
Страница 7: ...Section I General Quincy Compressor QSI 5 MODEL IDENTIFICATION...
Страница 62: ...Section IV Operating Procedures 60 Quincy Compressor QSI 1 Week Timer 2 Remaining Running Time...
Страница 79: ...Section IV Operating Procedures Quincy Compressor QSI 77...
Страница 140: ...Table of Contents Quincy Compressor QSI...