SECTION 4
Pronar N262 N262/1
4.19
TIP
In order to obtain uniform spreading in the beginning of operation, increase PTO rotation
speed to maximum 1000 rpm and engage the chain conveyor when the manure spreader
is still motionless. Spread manure while the manure spreader is motionless until a
sufficient amount of manure is delivered to the spreader unit wormshafts. Then, engage
appropriate tractor gear and start working.
In order to ensure optimum spreading, maintain PTO rotation speed at the level of 1,000
rpm.
DANGER
Do NOT use PTO rotation speed other than 1,000 rpm. If PTO shaft works at a different
speed, rotation speed of disintegrating wormshafts will be insufficient and the drive will
be at the risk of damage.
Raise the load box slide gate
Engage the chain conveyor.
Engage appropriate tractor gear and start working.
Disengage PTO when making turns during operation. Protection of
PTO shaft and uniform spreading are ensured in this way.
ATTENTION
Do NOT use another manure spreader starting procedure.
The feeding mechanism may be started only if the slide gate is raised.
The load can be moved forward only in exceptional situations such as in the case of
blocking of disintegrating drums or when the tractor rear wheels lose grip. When moving
the load forwards, the load must not touch the front wall because the load box or drive
transmission system may be damaged.
Before turning and during transport the tractor PTO drive should be disconnected.
4.6
SPREADING MECHANISM CLOGGING
If the spreading mechanism (spreader unit) is clogged during spreading, the clogging
elements can be removed by moving the floor conveyor towards the front wall. If the spreader
unit is still clogged, disengage PTO drive and chain conveyor and raise the tailgate. Switch
off tractor engine, disconnect PTO shaft and lock the tailgate using a cut-off valve and proper
Содержание PRONAR N262
Страница 2: ......
Страница 6: ......
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 25: ...SECTION 2 SAFETY ADVICE ...
Страница 44: ...Pronar N262 N262 1 SECTION 2 2 20 ...
Страница 45: ...SECTION 3 DESIGN AND OPERATION ...
Страница 70: ...Pronar N262 N262 1 SECTION 3 3 26 FIG 3 19 Electrical system diagram ...
Страница 72: ...Pronar N262 N262 1 SECTION 3 3 28 ...
Страница 73: ...SECTION 4 CORRECT USE ...
Страница 95: ...SECTION 5 MAINTENANCE ...
Страница 122: ...Pronar N262 N262 1 SECTION 5 5 28 FIG 5 11 Spreader s lubrication points N262 ...
Страница 123: ...SECTION 5 Pronar N262 N262 1 5 29 FIG 5 12 Spreader s lubrication points N262 1 ...
Страница 143: ...NOTES ...
Страница 145: ......