23
7.To conserve the limited air supply of the PEEBD1206, perform a pre-issue inspection
of the 2
nd
Stage Regulator purge while it is connected to the supply cylinder as follows:
b.
Briefly depress the purge button to ensure that sufficient airflow is provided to clear the
2
nd
Stage Regulator.
c.
Immediately after releasing the purge button, listen closely to ensure that the 2
nd
Stage
Regulator does not continue to flow any air.
8.While holding the 1
st
Stage Regulator and fill adapter secure, turn the PEEBDvalve
Control Knob clockwise until it stops and the red indicator is visible. Turn the
compressor fill valve until completely closed.
9.Depressthe 2
nd
Stage Regulator purge button until airflow can no longer be heard
from the 2
nd
Stage Regulator and the low-pressure hose is depressurized
10.Open the pressure relief screw on the compressor fill yoke to relieve the line
pressure.
11.While supportingthe PEEBDcylinder, turn the yoke screw of the compressor fill
yoke counter-clockwise to loosen until the compressor fill yoke can be removed from
the PEEBD 1
st
Stage Regulator block of the fill adapter. Return the compressor fill
yoke to its storage location.
12.While securely holding the PEEBDsecure, turn the fill adapter block counter-
clockwise at the fitting to loosen and remove from the PEEBD 1
st
Stage Regulator.
13.E n s u r e i t s O - R i n g i s p r e s e n t , s c r e w the fill port plug back into the
fill port of the PEEBD until finger tight.
14.When fillingis complete, remove and store the compressor adapter in a clean area.
Содержание PEEDB1206
Страница 1: ...0 Poseidon Emergency Egress Breathing Device PEEDB9393 4 500psi PEEDB1206 3 000psi User s Manual...
Страница 2: ...1 PEEBD9393 PEEBD1206...
Страница 18: ...17...
Страница 35: ...34 1st Stage Regulator Diagram...
Страница 36: ...35 2nd StageRegulatorExplodedPartsDiagram...