11
Prior to Use and Filling, the Cylinder torque to the 1
st
Stage Regulator should
be verified by an approved OEM Approved technician.
General Information:
1
st
Stage Regulator withCylinder
Preparationand Setup
Thepurposeofthismanualistofamiliarizeyouwiththecorrectsetup, filling, Inspection and
Maintenance of the PEEBD.
ThePEEBDispackagedfullyassembledandready touse
afterithasbeen filledwithair by the
purchaser
at
an
OEM
Approved
facility
.Beforeusingithowever,itisveryimportanttocarefullyread and understand the procedures
outlined in this manual for filling the PEEBD and performing a User Inspection.
Only personnel trained in the use of SCUBA diving apparatus should use the PEEBD – DO NOT
attempt to use the PEEBD without formal approved current certified SCUBA training
General Filling procedures
NOTE
: To estimate theaveragedurationofairsupply it is recommended the User undertake a
Pool Training session with acompletelyfullPEEBDcylinder, to determine duration with that
User (note – it is recommended the Pool Training session be undertaken in pool
temperature no greater than 16 degrees Celsius where the User will consume a greater
quantity of air with each breath)
ThePEEBD1206shall befilled to3,000PSI/207BAR(coldfill),toprovidemaximum breathvolume.
The PEEBD9393 shall be filled to 4,500psi / 310 Bar(coldfill),inordertoprovidemaximum
breathvolume.
Содержание PEEDB1206
Страница 1: ...0 Poseidon Emergency Egress Breathing Device PEEDB9393 4 500psi PEEDB1206 3 000psi User s Manual...
Страница 2: ...1 PEEBD9393 PEEBD1206...
Страница 18: ...17...
Страница 35: ...34 1st Stage Regulator Diagram...
Страница 36: ...35 2nd StageRegulatorExplodedPartsDiagram...