22
¹
4
"
14"
38
¹
4
"
56"
72"
107"
121"
16"
16"
Items for STEP 20:
(6) swing hangers
(6)
³₈
" x 3" lag screws
(6)
³₈
" washers
25
Front View
Mark the top beam board, on the bottom edge, at the dimensions shown, for
swing hanger locations.
NOTE: If you are installing the Air Rider, follow the installation
instructions that are supplied with the Air Rider.
Drill a
¹₄
" hole 2
¹₂
" deep in the center of the bottom board at each swing
hanger location.
Screw swing hangers into beam by hand (a long screwdriver will help).
Tighten swing hanger until loop is tight against adjoining board and swing
hanger is positioned as shown.
Drill another
¹₄
" hole 2
¹₂
" deep in adjoining board through swing hanger loop
and secure each swing hanger with one
³₈
" x 3" lag screw and
³₈
" washer.
Содержание VARSITY BRONZE
Страница 44: ...THIS PAGE INTENTIONALLY LEFT BLANK 44 ...