16
Items for STEP 10:
(2) 2" x 4" x 24
¹⁄₄
" boards
(1) 2" x 4" x 31
¹⁄₂
" boards
(12) #8 x 2
¹⁄₂
" deck screws
Attach two 2" x 4" x 24
¹⁄₄
" boards centered in the tower as shown.
Secure with #8 x 2
¹⁄₂
" deck screws.
Attach one pre-drilled 2" x 4" x 31
¹⁄₂
" boards at dimensions shown.
Make sure there is an overhang of 1
³⁄₄
" on each end of the
2" x 4" x 24
¹⁄₄
" boards as shown. Secure with #8 x 2
¹⁄₂
" deck screws.
S
EE
P
AGES
7 & 8 F
OR
H
OLE
P
ATTERNS
Items for STEP 9:
(2) 2" x 4" x 31
¹⁄₂
" boards
(8) #8 x 2
¹⁄₂
" deck screws
Attach two pre-drilled 2" x 4" x 31
¹⁄₂
" boards at dimensions shown.
Center boards on tower, there should an overhang on each end of
the boards. Make sure the top and bottom of board is flush while
securing with #8 x 2
¹⁄₂
" deck screws.
S
EE
P
AGES
7 & 8 F
OR
H
OLE
P
ATTERNS
2" x
4" x
31
¹⁄₂
"
2" x
4" x
31
¹⁄₂
"
¹⁄₂
" overhang
1
¹⁄₈
"
2" x
4" x
31
¹⁄₂
"
2
"
x
4
"
x
2
4
¹⁄
₄
"
2
"
x
4
"
x
2
4
¹⁄
₄
"
23
¹⁄₈
"
23
¹⁄₈
"
1
³⁄₄
"
overhang
D
D
D
D
D
D
C
C
D
D
2
³⁄₈
"
Содержание VARSITY BRONZE
Страница 44: ...THIS PAGE INTENTIONALLY LEFT BLANK 44 ...