Items for STEP 32:
(1) Tarp Awning
(6) #14 x 1
¹⁄₄
" pan head screws
Position edge of tarp awning flush with the back
2" x 4" x 31
¹⁄₂
" board as shown and centered side to side.
Pre-drill
¹⁄₈
" holes 1" deep into the board.
Secure with three #14 x 1
¹⁄₄
" pan head screws through
grommets.
Pull tarp tight and repeat to secure lower end.
37
Attach
this end first.
Beneath View
Attach
this
end first
2" x 4" x 31
¹⁄₂
"
Edge flush with
back of board
Содержание VARSITY BRONZE
Страница 44: ...THIS PAGE INTENTIONALLY LEFT BLANK 44 ...