15
³₄
"
flush
H
H
H
2" x
6"
x 8
8"
2" x
6"
x 3
5
⁷₈
"
J
J
J
J
J
113
³₄
"
99
³₄
"
64
³₄
"
48
³₄
"
H
J
2
J
"
³₄
99
"
³₄
113
2" x
6"
x 8
8"
J
J
"
³₄
64
H
H
J
"
³₄
48
³₄
64
"
³₄
15
"
⁷₈
2" x
6"
x 3
5
5
⁷
J
flush
Items for STEP 18:
(1) 2" x 6" x 88" board
(1) 2" x 6" x 35
⁷₈
" board
(16) #8 x 2
¹₂
" deck screws
Predrill the 2" x 6" x 88" and 2" x 6" x 35
⁷₈
" beam boards at the dimension shown.
(See Pages 7 & 8 “How To Use Your Drill Template For Drill Holes” for details.)
Attach the drilled 2" x 6" x 88" and 2" x 6" x 35
⁷₈
" board on top of the existing assembly as shown.
Make sure boards are flush with bottom board. Secure boards together with #8 x 2
¹₂
" screws.
Note: If your boards are a different length, flush the end with the single post.
S
EE
P
AGE
7 & 8 F
OR
H
OLE
P
ATTERNS
23
Содержание VARSITY BRONZE
Страница 44: ...THIS PAGE INTENTIONALLY LEFT BLANK 44 ...